大顶子山航电枢纽工程灯泡贯流式机组主轴组装、吊装及轴线调整工艺浅析 被引量:3

Brief analysis on technology for main shaft assembling,installation and axis adjustment of bulb turbine and generator units of Dadingzishan Navigation and Hydropower Project
在线阅读 下载PDF
导出
摘要 对松花江大顶子山航电枢纽工程灯泡贯流式水轮发电机组主轴组装、安装及轴线调整工艺进行分析,同时计算出了主轴在安装过程中主要参数的调整量,对其它类似电站具有借鉴意义。 The technology for main shaft assembling,installation and axis adjustment of the bulb turbine and generator units of Dadingzishan Navigation and Hydropower Project is briefly analyzed herein;in which the main parameters of the adjustments for the installation of the main shafts are calculated,which can be provided as reference for the other similar projects.
出处 《水利水电技术》 CSCD 北大核心 2008年第12期78-80,共3页 Water Resources and Hydropower Engineering
关键词 灯泡贯流式水轮发电机组 主轴组装 安装 轴线调整 大顶子山航电枢纽工程 bulb turbine and generator unit main shaft assembling installation axis adjustment Dadingzishan Navigation and Hydropower Project
  • 相关文献

同被引文献4

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部