摘要
上海污水治理2期1.1标是穿越黄浦江的倒虹管工程,环境保护要求高,施工难度大。为此,重点介绍了我国第1台泥水平衡顶管机在上海污水治理工程中的应用,研究了泥水平衡顶管施工参数,找出了泥水平衡顶管施工引起的地面沉降规律.
Contract 1.1 of Shanghai Sewerage Implementation Project Ⅱ stage is a work to cross the Huangpu River as an inverted siphon,where the requirements for environment protection is strict and work operation is difficult.The application of the first slurry balanced pipe jacking machine in China is presented to this project. Study is made on construction parameters for slurry balanced pipe jacking operation in order to find the behavior of induced ground settlement.
出处
《岩石力学与工程学报》
EI
CAS
CSCD
北大核心
2003年第z1期2493-2501,共9页
Chinese Journal of Rock Mechanics and Engineering
关键词
隧道工程
工作原理
技术参数
设定与调整
地面沉降规律
tunneling engineering
principles of operation
technical parameters
setting and adjustment
behavior of ground settlement