Large goods transported in railway are kinds of special goods and they are very important in national construction. In order to transport safely, loading and reinforcing schemes must be made first. How to design a rea...Large goods transported in railway are kinds of special goods and they are very important in national construction. In order to transport safely, loading and reinforcing schemes must be made first. How to design a reasonable scheme will be affected by many factors. This paper presents the characteristic of the large goods, summarizes the process of designing a loading and reinforcing scheme of large good, then probes the factors of affecting the loading and reinforcing scheme and gives a detail analysis. It’s considered that those out-of-gauge and overweight degree of goods, center-of- gravity height of a loaded wagon, position of center-of-gravity of goods, type of wagon for using, reinforcement material and reinforcement method, transport expense and transport organization could affect a scheme in the aspects of safety, economy, rapidity and convenience. This conclusion will instruct and help to make a good scheme.展开更多
For the tunnel crossing active fault,the damage induced by fault movement is always serious.To solve such a problem,a detailed anti-faulting tunnel design process for Urumqi subway line 2 was introduced,and seven thre...For the tunnel crossing active fault,the damage induced by fault movement is always serious.To solve such a problem,a detailed anti-faulting tunnel design process for Urumqi subway line 2 was introduced,and seven three-dimensional elastic-plastic finite element models were established.The anti-faulting design process included three steps.First,the damage of tunnel lining from different locations of fault rupture surfaces was analyzed.Then,the analysis of the effect on tunnel buried depth was given.Finally,the effect of the disaster mitigation method on the flexible joint was verified and the location of the flexible joint was discussed.The results show that when the properties of surrounding rock at the tunnel bottom grows soft,the tunnel deformation curve is smoother and tunnel damage induced by fault movement is less serious.The vertical displacement change ratio of secondary linings along the tunnel axis may be the main factor to cause shear damage to the tunnel.The interface between the hanging wall and fracture zone is defined as the most adverse fault rupture surface.The tunnel damage was reduced with the decrease in the tunnel buried depth as more energy was dissipated by overburden soil and the differential uplift zone of soil became more diffuse.The method of the flexible joint can reduce the tunnel damage significantly and the disaster mitigation effect of different locations on the flexible joint is different.The tunnel damage is reduced by the greatest degree when the flexible joint is located on the fault rupture surface.展开更多
In order to obtain the seismic responses of the soil-rectangular tunnel structure,based on the PL-Finn constitutive model,four different conditions,namely,the liquefied soil around the rectangular tunnel,the liquefied...In order to obtain the seismic responses of the soil-rectangular tunnel structure,based on the PL-Finn constitutive model,four different conditions,namely,the liquefied soil around the rectangular tunnel,the liquefied soil below the rectangular tunnel,the liquefied soil on either side of the tunnel and the structure on non-liquefied soil,are compared.In accordance to the time at which a large deformation occurs,the possibility of destruction from hard to easy follows a descending order:the liquefied soil all around the structure,the liquefied soil on the bottom of the structure,and the liquefied soil on the two sides of the structure.The area of large deformation is mostly beneath the two arch angles of the tunnel floor.The soil on the two sides,especially close to the structure,is the hardest to liquefy and deform.The large deformation of soil caused by the liquefaction appears after the peak seismic value occurs.The higher the input seismic value is,the easier a large deformation can take place.With the same input of peak ground motion,the total displacement vector of the structure and differential displacement of the side-wall are in accordance with an order from large to small in the three situations:when the saturated sand is on two sides,all around the structure,and on the bottom of the structure.展开更多
文摘Large goods transported in railway are kinds of special goods and they are very important in national construction. In order to transport safely, loading and reinforcing schemes must be made first. How to design a reasonable scheme will be affected by many factors. This paper presents the characteristic of the large goods, summarizes the process of designing a loading and reinforcing scheme of large good, then probes the factors of affecting the loading and reinforcing scheme and gives a detail analysis. It’s considered that those out-of-gauge and overweight degree of goods, center-of- gravity height of a loaded wagon, position of center-of-gravity of goods, type of wagon for using, reinforcement material and reinforcement method, transport expense and transport organization could affect a scheme in the aspects of safety, economy, rapidity and convenience. This conclusion will instruct and help to make a good scheme.
基金The National Natural Science Foundation of China(No.41572276)the National Key Research and Development Program of China(No.2017YFC0805400).
文摘For the tunnel crossing active fault,the damage induced by fault movement is always serious.To solve such a problem,a detailed anti-faulting tunnel design process for Urumqi subway line 2 was introduced,and seven three-dimensional elastic-plastic finite element models were established.The anti-faulting design process included three steps.First,the damage of tunnel lining from different locations of fault rupture surfaces was analyzed.Then,the analysis of the effect on tunnel buried depth was given.Finally,the effect of the disaster mitigation method on the flexible joint was verified and the location of the flexible joint was discussed.The results show that when the properties of surrounding rock at the tunnel bottom grows soft,the tunnel deformation curve is smoother and tunnel damage induced by fault movement is less serious.The vertical displacement change ratio of secondary linings along the tunnel axis may be the main factor to cause shear damage to the tunnel.The interface between the hanging wall and fracture zone is defined as the most adverse fault rupture surface.The tunnel damage was reduced with the decrease in the tunnel buried depth as more energy was dissipated by overburden soil and the differential uplift zone of soil became more diffuse.The method of the flexible joint can reduce the tunnel damage significantly and the disaster mitigation effect of different locations on the flexible joint is different.The tunnel damage is reduced by the greatest degree when the flexible joint is located on the fault rupture surface.
基金The National Natural Science Foundation of China(No.41572276)the National Key Research and Development Program of China(No.2017YFC0805400)
文摘In order to obtain the seismic responses of the soil-rectangular tunnel structure,based on the PL-Finn constitutive model,four different conditions,namely,the liquefied soil around the rectangular tunnel,the liquefied soil below the rectangular tunnel,the liquefied soil on either side of the tunnel and the structure on non-liquefied soil,are compared.In accordance to the time at which a large deformation occurs,the possibility of destruction from hard to easy follows a descending order:the liquefied soil all around the structure,the liquefied soil on the bottom of the structure,and the liquefied soil on the two sides of the structure.The area of large deformation is mostly beneath the two arch angles of the tunnel floor.The soil on the two sides,especially close to the structure,is the hardest to liquefy and deform.The large deformation of soil caused by the liquefaction appears after the peak seismic value occurs.The higher the input seismic value is,the easier a large deformation can take place.With the same input of peak ground motion,the total displacement vector of the structure and differential displacement of the side-wall are in accordance with an order from large to small in the three situations:when the saturated sand is on two sides,all around the structure,and on the bottom of the structure.