Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excav...Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excavation process is dynamically simulated to analyze the stress and strain field status of surrounding rock and segment.The maximum tensile stress of segment ring caused by tunnel construction mainly lies in arch bottom and presents zonal distribution.The stress increases slightly and limitedly in the course of excavation.The maximum and minimum displacements of segment,manifesting as zonal distribution,distribute in arch bottom and vault respectively.The displacements slightly increase with the advance of TBM and gradually tend to stability.展开更多
There are many examples of TBM tunnels through mountains, or in mountainous terrain, which have suffered the ultimate fate of abandonment, due to insufficient pre-investigation. Depth-of-drilling limitations are inevi...There are many examples of TBM tunnels through mountains, or in mountainous terrain, which have suffered the ultimate fate of abandonment, due to insufficient pre-investigation. Depth-of-drilling limitations are inevitable when depths approach or even exceed l or 2 km. Uncertainties about the geology, hydro-geology, rock stresses and rock strengths go hand-in-hand with deep or ultra-deep tunnels. Unfortunately, unexpected conditions tend to have a much bigger impact on TBM projects than on drill-and-blast projects. There are two obvious reasons. Firstly the circular excavation maximizes the tangential stress, making the relation to rock strength a higher source of potential risk. Secondly, the TBM may have been progressing fast enough to make probe-drilling seem to be unnecessary. If the stress-to-strength ratio becomes too high, or if faulted rock with high water pressure is unexpectedly encountered, the "unexpected events" may have a remarkable delaying effect on TBM. A simple equation explains this phenomenon, via the adverse local Q-value that links directly to utilization. One may witness dramatic reductions in utilization, meaning ultra-steep deceleration-of-the-TBM gradients in a log-log plot of advance rate versus time. Some delays can be avoided or reduced with new TBM designs, where belief in the need for probe-drilling and sometimes also pre-injection, have been fully appreciated. Drill-and-blast tunneling, inevitably involving numerous "probe-holes" prior to each advance, should be used instead, if investigations have been too limited. TBM should be used where there is lower cover and where more is known about the rock and structural conditions. The advantages of the superior speed of TBM may then be fully realized. Choosing TBM because a tunnel is very long increases risk due to the law of deceleration with increased length, especially if there is limited pre-investigation because of tunnel depth.展开更多
This paper focuses on the evolution processes of different types of rockbursts occurring in deep tunnels. A series of laboratory tests and in-situ monitoring in deep tunnels excavated by tunnel boring machine (TBM) ...This paper focuses on the evolution processes of different types of rockbursts occurring in deep tunnels. A series of laboratory tests and in-situ monitoring in deep tunnels excavated by tunnel boring machine (TBM) and drill-and-blast (D&B) method have been conducted to understand the mechanisms and processes of the evolution of different types of rockbursts, including strain rockburst, strain-structure slip rockburst, immediate rockburst and time-delayed rockburst. Three different risk assessment methods are proposed to evaluate the intensity and potential failure depth of rockbursts. These methods can be applied before excavation and the results can be updated according to the real-time information during excavation. Two micro-seismicity based real-time warning systems have been established for predicting various intensities ofrockbursts, such as slight, moderate, intensive and extremely intensive rockbursts. Meanwhile, the probability and intensity of the rockburst are also given. The strategy for excavation and support design has been suggested for various intensities of rockbursts before excavation. The strategy for dynamic control of the rockburst evolution process is also proposed according to the monitoring results. The methodology has been successfully applied to rockburst risk reduction for deep tunnels at Jinping II hydropower project. The results have illustrated the applicability of the proposed methodology and techniques concerning rockbursts.展开更多
This study presents an application of artificial neural network(ANN)and Bayesian network(BN)for evaluation of jamming risk of the shielded tunnel boring machines(TBMs)in adverse ground conditions such as squeezing gro...This study presents an application of artificial neural network(ANN)and Bayesian network(BN)for evaluation of jamming risk of the shielded tunnel boring machines(TBMs)in adverse ground conditions such as squeezing grounds.The analysis is based on database of tunneling cases by numerical modeling to evaluate the ground convergence and possibility of machine entrapment.The results of initial numerical analysis were verified in comparison with some case studies.A dataset was established by performing additional numerical modeling of various scenarios based on variation of the most critical parameters affecting shield jamming.This includes compressive strength and deformation modulus of rock mass,tunnel radius,shield length,shield thickness,in situ stresses,depth of over-excavation,and skin friction between shield and rock.Using the dataset,an ANN was trained to predict the contact pressures from a series of ground properties and machine parameters.Furthermore,the continuous and discretized BNs were used to analyze the risk of shield jamming.The results of these two different BN methods are compared to the field observations and summarized in this paper.The developed risk models can estimate the required thrust force in both cases.The BN models can also be used in the cases with incomplete geological and geomechanical properties.展开更多
Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different...Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different tunnel sections, which makes the construction scheduling and management difficult. Based on the rock mass classification, this paper estimates the penetration rate. Using the rate, a cyclic network simulation (CYCLONE) model of TBM boring system is established, and the advance rates under different geological conditions are determined. Then, the impact of different cutter head thrust, which is chosen in reasonable range according to previous experiences, on pro- ject schedule is analyzed. Moreover, the simulation model of mucking system is built to determine the number of muck trains and rail intersections reasonably, regarding the efficiency of muck loading and material transporting. Based on the interaction and interrelation between TBM boring system and mucking system, the combined CY- CLONE model for the entire tunneling process is established. Then reasonable construction schedule, the utilization rate of working resources, and the probability of project completion are obtained through the model programming. At last, a project application shows the feasibility of the presented method.展开更多
基金Supported by National Natural Science Foundation of China(No.90815019)National Key Basic Research Program of China("973" Program,No.2007CB714101)Key Project in the National Science and Technology Pillar Program during the Eleventh Five-Year Plan Period(No.2006BAB04A13)
文摘Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excavation process is dynamically simulated to analyze the stress and strain field status of surrounding rock and segment.The maximum tensile stress of segment ring caused by tunnel construction mainly lies in arch bottom and presents zonal distribution.The stress increases slightly and limitedly in the course of excavation.The maximum and minimum displacements of segment,manifesting as zonal distribution,distribute in arch bottom and vault respectively.The displacements slightly increase with the advance of TBM and gradually tend to stability.
文摘There are many examples of TBM tunnels through mountains, or in mountainous terrain, which have suffered the ultimate fate of abandonment, due to insufficient pre-investigation. Depth-of-drilling limitations are inevitable when depths approach or even exceed l or 2 km. Uncertainties about the geology, hydro-geology, rock stresses and rock strengths go hand-in-hand with deep or ultra-deep tunnels. Unfortunately, unexpected conditions tend to have a much bigger impact on TBM projects than on drill-and-blast projects. There are two obvious reasons. Firstly the circular excavation maximizes the tangential stress, making the relation to rock strength a higher source of potential risk. Secondly, the TBM may have been progressing fast enough to make probe-drilling seem to be unnecessary. If the stress-to-strength ratio becomes too high, or if faulted rock with high water pressure is unexpectedly encountered, the "unexpected events" may have a remarkable delaying effect on TBM. A simple equation explains this phenomenon, via the adverse local Q-value that links directly to utilization. One may witness dramatic reductions in utilization, meaning ultra-steep deceleration-of-the-TBM gradients in a log-log plot of advance rate versus time. Some delays can be avoided or reduced with new TBM designs, where belief in the need for probe-drilling and sometimes also pre-injection, have been fully appreciated. Drill-and-blast tunneling, inevitably involving numerous "probe-holes" prior to each advance, should be used instead, if investigations have been too limited. TBM should be used where there is lower cover and where more is known about the rock and structural conditions. The advantages of the superior speed of TBM may then be fully realized. Choosing TBM because a tunnel is very long increases risk due to the law of deceleration with increased length, especially if there is limited pre-investigation because of tunnel depth.
基金supported by China National Basic Research Project under Grant No. 2010CB732006Key Projects of Chinese Academy of Sciences under Grant No. KZZD-EW-05-03
文摘This paper focuses on the evolution processes of different types of rockbursts occurring in deep tunnels. A series of laboratory tests and in-situ monitoring in deep tunnels excavated by tunnel boring machine (TBM) and drill-and-blast (D&B) method have been conducted to understand the mechanisms and processes of the evolution of different types of rockbursts, including strain rockburst, strain-structure slip rockburst, immediate rockburst and time-delayed rockburst. Three different risk assessment methods are proposed to evaluate the intensity and potential failure depth of rockbursts. These methods can be applied before excavation and the results can be updated according to the real-time information during excavation. Two micro-seismicity based real-time warning systems have been established for predicting various intensities ofrockbursts, such as slight, moderate, intensive and extremely intensive rockbursts. Meanwhile, the probability and intensity of the rockburst are also given. The strategy for excavation and support design has been suggested for various intensities of rockbursts before excavation. The strategy for dynamic control of the rockburst evolution process is also proposed according to the monitoring results. The methodology has been successfully applied to rockburst risk reduction for deep tunnels at Jinping II hydropower project. The results have illustrated the applicability of the proposed methodology and techniques concerning rockbursts.
文摘This study presents an application of artificial neural network(ANN)and Bayesian network(BN)for evaluation of jamming risk of the shielded tunnel boring machines(TBMs)in adverse ground conditions such as squeezing grounds.The analysis is based on database of tunneling cases by numerical modeling to evaluate the ground convergence and possibility of machine entrapment.The results of initial numerical analysis were verified in comparison with some case studies.A dataset was established by performing additional numerical modeling of various scenarios based on variation of the most critical parameters affecting shield jamming.This includes compressive strength and deformation modulus of rock mass,tunnel radius,shield length,shield thickness,in situ stresses,depth of over-excavation,and skin friction between shield and rock.Using the dataset,an ANN was trained to predict the contact pressures from a series of ground properties and machine parameters.Furthermore,the continuous and discretized BNs were used to analyze the risk of shield jamming.The results of these two different BN methods are compared to the field observations and summarized in this paper.The developed risk models can estimate the required thrust force in both cases.The BN models can also be used in the cases with incomplete geological and geomechanical properties.
基金Supported by National Natural Science Foundation of China (No.50709024)Program for New Century Excellent Talents in University (No. NCET-08-0391)
文摘Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different tunnel sections, which makes the construction scheduling and management difficult. Based on the rock mass classification, this paper estimates the penetration rate. Using the rate, a cyclic network simulation (CYCLONE) model of TBM boring system is established, and the advance rates under different geological conditions are determined. Then, the impact of different cutter head thrust, which is chosen in reasonable range according to previous experiences, on pro- ject schedule is analyzed. Moreover, the simulation model of mucking system is built to determine the number of muck trains and rail intersections reasonably, regarding the efficiency of muck loading and material transporting. Based on the interaction and interrelation between TBM boring system and mucking system, the combined CY- CLONE model for the entire tunneling process is established. Then reasonable construction schedule, the utilization rate of working resources, and the probability of project completion are obtained through the model programming. At last, a project application shows the feasibility of the presented method.