Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home a...Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home and abroad were introduced.Moreover,the problems existing in the on-line monitoring of electromagnetic environment were expounded,and the development prospect was forecasted.展开更多
This paper uses CT to gain the energy directly from the high-voltage transmission line, to address the problem of power supply for monitoring system in high voltage side of transmission line. The draw-out power coil c...This paper uses CT to gain the energy directly from the high-voltage transmission line, to address the problem of power supply for monitoring system in high voltage side of transmission line. The draw-out power coil can induce voltage from the transmission line, using single-chip microcomputer to analog and output PMW wave to control the charging module, provides a stable 3.4 V DC voltage to the load, and solve the problem of easy saturating of core. The power supply based on this kind of draw-out power coil has undergone the overall testing, and it is verified-showing that it can properly work in a non-saturated status within the current range of 50 - 1000 A, and provide a stable output. The equipment also design protection circuit to improve the reliability to avid the impacts of the impulse current or short-circuit current. It effectively solves the problem of power supply for On-line Monitoring System of Transmission.展开更多
In recent years,with the rapid development of high-speed railways(HSRs),power interruptions or disturbances in traction power supply systems have become increasingly dangerous.However,it is often impossible to detect ...In recent years,with the rapid development of high-speed railways(HSRs),power interruptions or disturbances in traction power supply systems have become increasingly dangerous.However,it is often impossible to detect these faults immediately through single-point monitoring or collecting data after accidents.To coordinate the power quality data of both traction power supply systems(TPSSs)and high-speed trains(HSTs),a monitoring and assessing system is proposed to access the power quality issues on HSRs.By integrating train monitoring,traction substation monitoring and data center,this monitoring system not only realizes the real-time monitoring of operational behaviors for both TPSSs and HSTs,but also conducts a comprehensive assessment of operational quality for train-network systems.Based on a large number of monitoring data,the field measurements show that this real-time monitoring system is effective for monitoring and evaluating a traction-network system.展开更多
As weather radar stations require headroom environment to operate,they were mostly built on highlands which are usually unattended.The mains supply is relatively poor,and the risk of radar stoppages due to power outag...As weather radar stations require headroom environment to operate,they were mostly built on highlands which are usually unattended.The mains supply is relatively poor,and the risk of radar stoppages due to power outage is therefore ever-present.As such,the radar construction program is used to build a complementary security video monitoring system.By collecting monitoring images of the regulated power supply in real-time from power supply auto transfer systems in distribution rooms and radar transceiver rooms,using Spearman’s rank correlation coefficient to analyse pixel variation trends,and supplementing statistical analysis of pixel characteristics difference to eliminate misjudgments resulting from low image contrast in special scenarios,a software can be developed through C#.It has the function of automatically monitoring mains supply and alerting staff on duty to handle the power outage in a timely manner via text message so that any potential risk is neutralised before it can cause damage.This monitoring and auto-alerting approach is generally applicable to unattended rooms with large amounts of electronical equipment.展开更多
Based on the system of electric power supply for flexible manufacturing systems (FMS), a study has been carried out on the intelligent safety examination, monitoring and maintenance of its running environment. On the ...Based on the system of electric power supply for flexible manufacturing systems (FMS), a study has been carried out on the intelligent safety examination, monitoring and maintenance of its running environment. On the basis of the specific feature of the power supply network of an FMS, real time monitoring system of the power supply network and the fault diagnostic expert system for the power equipment have been designed. This system can diagnose not only definite fault phenomena, but also fuzzy, uncertain fault phenomena as well. Fault diagnostic knowledge base for the power equipment has been founded hierarchy architecture model and the method of fault tree analysis. Feasibility of this system has been proved by computer simulation.展开更多
辐射环境监测是我国环境建设和生态文明建设中的重要内容,随之兴起的辐射环境监测自动站则成为辐射环境监测的重点。基于理论分析,明确辐射环境监测自动站的具体运行需求,建立在不间断供电的基础上,分析了不间断供电系统(Uninterruptabl...辐射环境监测是我国环境建设和生态文明建设中的重要内容,随之兴起的辐射环境监测自动站则成为辐射环境监测的重点。基于理论分析,明确辐射环境监测自动站的具体运行需求,建立在不间断供电的基础上,分析了不间断供电系统(Uninterruptable Power System,UPS)的具体配置方案与核心原理,结合具体的案例,明确了辐射环境监测自动站供电系统的运行逻辑与规划方案,并提出了多元化的维护政策,以保证辐射环境监测自动站的供电稳定运行。展开更多
基金Supported by the Open Project of Jiangsu Key Laboratory of Environmental Engineering(ZX2017005)
文摘Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home and abroad were introduced.Moreover,the problems existing in the on-line monitoring of electromagnetic environment were expounded,and the development prospect was forecasted.
文摘This paper uses CT to gain the energy directly from the high-voltage transmission line, to address the problem of power supply for monitoring system in high voltage side of transmission line. The draw-out power coil can induce voltage from the transmission line, using single-chip microcomputer to analog and output PMW wave to control the charging module, provides a stable 3.4 V DC voltage to the load, and solve the problem of easy saturating of core. The power supply based on this kind of draw-out power coil has undergone the overall testing, and it is verified-showing that it can properly work in a non-saturated status within the current range of 50 - 1000 A, and provide a stable output. The equipment also design protection circuit to improve the reliability to avid the impacts of the impulse current or short-circuit current. It effectively solves the problem of power supply for On-line Monitoring System of Transmission.
文摘In recent years,with the rapid development of high-speed railways(HSRs),power interruptions or disturbances in traction power supply systems have become increasingly dangerous.However,it is often impossible to detect these faults immediately through single-point monitoring or collecting data after accidents.To coordinate the power quality data of both traction power supply systems(TPSSs)and high-speed trains(HSTs),a monitoring and assessing system is proposed to access the power quality issues on HSRs.By integrating train monitoring,traction substation monitoring and data center,this monitoring system not only realizes the real-time monitoring of operational behaviors for both TPSSs and HSTs,but also conducts a comprehensive assessment of operational quality for train-network systems.Based on a large number of monitoring data,the field measurements show that this real-time monitoring system is effective for monitoring and evaluating a traction-network system.
基金Supported by Science and Technology Open Research Fund Project of Guizhou Meteorological Bureau(KF[2009]08)。
文摘As weather radar stations require headroom environment to operate,they were mostly built on highlands which are usually unattended.The mains supply is relatively poor,and the risk of radar stoppages due to power outage is therefore ever-present.As such,the radar construction program is used to build a complementary security video monitoring system.By collecting monitoring images of the regulated power supply in real-time from power supply auto transfer systems in distribution rooms and radar transceiver rooms,using Spearman’s rank correlation coefficient to analyse pixel variation trends,and supplementing statistical analysis of pixel characteristics difference to eliminate misjudgments resulting from low image contrast in special scenarios,a software can be developed through C#.It has the function of automatically monitoring mains supply and alerting staff on duty to handle the power outage in a timely manner via text message so that any potential risk is neutralised before it can cause damage.This monitoring and auto-alerting approach is generally applicable to unattended rooms with large amounts of electronical equipment.
文摘Based on the system of electric power supply for flexible manufacturing systems (FMS), a study has been carried out on the intelligent safety examination, monitoring and maintenance of its running environment. On the basis of the specific feature of the power supply network of an FMS, real time monitoring system of the power supply network and the fault diagnostic expert system for the power equipment have been designed. This system can diagnose not only definite fault phenomena, but also fuzzy, uncertain fault phenomena as well. Fault diagnostic knowledge base for the power equipment has been founded hierarchy architecture model and the method of fault tree analysis. Feasibility of this system has been proved by computer simulation.
文摘辐射环境监测是我国环境建设和生态文明建设中的重要内容,随之兴起的辐射环境监测自动站则成为辐射环境监测的重点。基于理论分析,明确辐射环境监测自动站的具体运行需求,建立在不间断供电的基础上,分析了不间断供电系统(Uninterruptable Power System,UPS)的具体配置方案与核心原理,结合具体的案例,明确了辐射环境监测自动站供电系统的运行逻辑与规划方案,并提出了多元化的维护政策,以保证辐射环境监测自动站的供电稳定运行。