期刊文献+
共找到1,240篇文章
< 1 2 62 >
每页显示 20 50 100
Stability control of gob-side entry retained under the gob with close distance coal seams 被引量:11
1
作者 Zizheng Zhang Min Deng +2 位作者 Jianbiao Bai Shuai Yan Xianyang Yu 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2021年第2期321-332,共12页
In multi-seam mining,the interlayer rock strata between the upper coal seam(UCS)and the lower coal seam(LCS)appear damage and strength weakening after mining the UCS.Ground stability control of the gob-side entry reta... In multi-seam mining,the interlayer rock strata between the upper coal seam(UCS)and the lower coal seam(LCS)appear damage and strength weakening after mining the UCS.Ground stability control of the gob-side entry retaining(GER)under the gob with close distance coal seams(CDCS)is faced with difficulties due to little attention to GER under this condition.This paper focuses on surrounding rock stability control and technical parameters design for GER under the gob with CDCS.The floor rock strata damage characteristics after mining the UCS is first evaluated and the damage factor of the interlayer rock strata below the UCS is also determined.Then,a structural mechanics model of GER surrounding rock is set up to obtain the main design parameters of the side-roadway backfill body(SBB)including the maximum and minimum SBB width calculation formula.The optimal SBB width and the water-to-cement ratio of high water quick-setting material(HWQM)to construct the SBB are determined as 1.2 m and 1.5:1.0,respectively.Finally,engineering trial tests of GER are successfully carried out at#5210 track transportation roadway of Xingwu Colliery.Research results can guide GER design under similar mining and geological conditions. 展开更多
关键词 Gob-side entry retaining close distance coal seams Damage factor Interlayer rock strata Side-roadway backfill body
在线阅读 下载PDF
Measurement of overburden failure zones in close-multiple coal seams mining 被引量:9
2
作者 Yang Li Yuqi Ren +3 位作者 Syd S.Peng Haozhou Cheng Nan Wang Junbo Luo 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2021年第1期43-50,共8页
In the Kaiping Coal field,mining of five coal seams,located within 80 m in the Kailuan Group,#5,#7,#8,#9 and#12 coal seam,is difficult due to small interburden thickness,concentrated stress distributions,high coal sea... In the Kaiping Coal field,mining of five coal seams,located within 80 m in the Kailuan Group,#5,#7,#8,#9 and#12 coal seam,is difficult due to small interburden thickness,concentrated stress distributions,high coal seam metamorphism,and complex geological conditions.By using the ZTR12 geological penetration radar(GPR)survey combined with borehole observations,the overburden caving due to mining of the five coals seams was measured.The development characteristics of full-cover rock fractures after mining were obtained from the GPR scan,which provides a measurement basis for the control of rock strata in close multiple coal seam mining.For the first time,it was found that the overburden caving pattern shows a periodic triangular caved characteristic.Furthermore,it is proposed that an upright triangular collapsed pile masonry and an inverted triangular with larger fragments piled up alternately appear in the lower gob.The research results show that the roof structure formed in the gob area can support the key overlying strata,which is beneficial to ensure the integrity and stability of the upper coal seams in multiple-seam mining of close coal seams. 展开更多
关键词 Overburden measurement GPR survey close multiple coal seam Secondary roof break Periodic triangular cave Overburden caving
在线阅读 下载PDF
Layout and support design of a coal roadway in ultra-close multiple-seams 被引量:5
3
作者 严红 翁明月 +1 位作者 冯锐敏 李伟康 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第11期4385-4395,共11页
A roadway within ultra-close multiple-seams(RUCMSs) is one of the most difficult supported coal roadways to deal with in underground coal mines. This is usually due to the unknown stress distributions, improper roadwa... A roadway within ultra-close multiple-seams(RUCMSs) is one of the most difficult supported coal roadways to deal with in underground coal mines. This is usually due to the unknown stress distributions, improper roadway layout, and unreasonable support parameters. In order to solve this support problem and effectively save RUCMSs from frequent and abrupt disasters(such as serious deformation of the surrounding rock, roof cave ins, and coal side collapse), a comprehensive method is adopted here which includes theoretical analysis, numerical simulation, and field monitoring. A mechanical model was constructed to determine the stress distribution in the coal pillar after two sides of a longwall panel had been mined. Based on this model, the horizontal, vertical, and tangential stress equations for the plane below the floor of the upper-left coal pillar were deduced. In addition, a typical coal mine(the Jinggonger colliery, located in Shuozhou city, Shanxi province, China) with an average distance between its 9# and 11# coal seams of less than 8.0 was chosen to conduct research on the proper layout and reasonable support required for a typical coal roadway located within coal seam 11#. Using FLAC3D(Fast Lagrangian Analysis of Continua in 3-Dimensions) numerical software, eight schemes were designed with different horizontal distances(d) between the center lines of the coal pillar and the roadway in the lower coal seam(RLCS). The simulations and detailed analysis indicate that the proper distances required are between 22.5 and 27.5 m. A total of 20 simulation schemes were used to investigate the factors influencing the support provided by the key bolts(bolt length, spacing, distance between two rows, installation angle, and pre-tightening force). The results were analyzed and used to determine reasonable values for the support parameters. Field results show that the stability and strength of the RLCS can be effectively safeguarded using a combination of researched stress distribution characteristics, proper layout of the RLCS, and correct support parameters. 展开更多
关键词 ultra-close multiple-seams coal ROADWAY stress DIS
在线阅读 下载PDF
Study on ascending mining roadway layout of close distance coal seams in deep mine
4
作者 石永奎 莫技 《Journal of Coal Science & Engineering(China)》 2007年第4期493-496,共4页
To solve the problems appeared in mining process of No.2 seam, the ascending stress-releasing mining method was adopted. Studying on the reasonable layout of actual mining roadway in upper coal seams is the preconditi... To solve the problems appeared in mining process of No.2 seam, the ascending stress-releasing mining method was adopted. Studying on the reasonable layout of actual mining roadway in upper coal seams is the precondition of successful ascending mining. By using "device of leak measuring by blocking up double ends", it detected the height of overburden water flowing fractured zone originated from sub-coal seams mining. Thus it proved that the actual mining roadway of No.2 upper ascending seam was located in the smooth sagging zone. On the basis of analyzing the stress-releasing effect of sub-coal seams mining to upper coal seams by using RFPA software, it analyzed the stability of up-face coal seams and the reasonable location of starting cut in up-face coal seams. It also analyzed the reasonable gateway location in upper coal seams, which ensured the crossheading in upper coal seams out of the effect of sub-coal work face mining by using theory of underground pressure. Meanwhile, the reasonable pillars dimensions in upper coal seams by building the structure mechanics model of stope were researched. It can make the roadway driven along next goaf to be located in low stress zone, and be beneficial to keeping roads stable owing to less stress of surrounding rock. Finally, it tested the rationality of the layout method of roads in upper coal seams by engineering field measurement in 3221 working face. 展开更多
关键词 deep mine close distance coal seams ascending mining RFPA roadway layout mode sublevel dimensions
在线阅读 下载PDF
Study on the economic mining method for the close quarter coal seams with thin rock sheet
5
作者 勾攀峰 陈兆强 员小有 《Journal of Coal Science & Engineering(China)》 2001年第2期26-29,共4页
The paper presents the mining method for the close quarter coal seams with thin rock sheet, that is mining the low coal seam, recovering the top coal seam after putting down the roof rock of the low coal seam. Practic... The paper presents the mining method for the close quarter coal seams with thin rock sheet, that is mining the low coal seam, recovering the top coal seam after putting down the roof rock of the low coal seam. Practice has proved that in recovering the top coal outside the face width after the rock between seams falls naturally or is demolished, the technology is simple, easy to operate and does not make a great demand for technical equipment. In the process of recovering the top coal, the low seam support could not be affected seriously, and two seams mining could be coordinated. Compared with the individual mining method, this mining method can produce a better economic benefit. 展开更多
关键词 close quarter coal seams mining method recovering top coal
在线阅读 下载PDF
大倾角极近距离煤层群重复采动巷道围岩破坏规律与控制方法
6
作者 贾后省 张志明 +4 位作者 刘少伟 彭博 于辉 邵帅钦 王艺博 《煤炭科学技术》 北大核心 2025年第2期68-80,共13页
大倾角极近距离煤层群开采过程中,巷道受多重采动影响,支护维护困难。针对此类问题,以代池坝煤矿大倾角极近距离煤层群重复采动巷道31233运输巷为工程背景,主要采用数值模拟和现场试验研究方法,研究了巷道围岩应力环境演化特征及其作用... 大倾角极近距离煤层群开采过程中,巷道受多重采动影响,支护维护困难。针对此类问题,以代池坝煤矿大倾角极近距离煤层群重复采动巷道31233运输巷为工程背景,主要采用数值模拟和现场试验研究方法,研究了巷道围岩应力环境演化特征及其作用下巷道围岩破坏规律,设计了有利于围岩塑性破坏分布收敛的非对称屋顶断面,提出了基于巷道围岩塑性区分布规律的非均匀锚杆(索)支护设计方法。研究结果表明:大倾角极近距离煤层群重复采动影响条件下,巷道周边双向主应力差值较大且方向偏转,导致巷道围岩周边破坏呈现非均匀、局部湮灭、最大破坏深度偏转等蝶形特征,巷道内错位置和断面形状决定了巷道破坏形态和范围,内错距直接影响了其围岩塑性区分布与扩展的程度,而坚硬岩层的存在造成塑性区局部湮灭。当巷道内错距离大于17 m时,巷道周边应力趋于稳定,其围岩塑性区大小与形态无明显变化,内错位置大于该距离时,对巷道的围岩稳定性最有利。巷道断面的单边跨度尺寸决定了其所在侧的塑性破坏深度,当巷道断面为非对称屋顶断面时,围岩塑性分布收敛程度显著。巷道断面设计时,巷道最长边应位于坚硬岩层侧且尽量避开最大破坏深度方向,以便充分利用坚硬岩层塑性区湮灭特性,避免巷道围岩塑性区蝶叶过度扩展。因此,可充分利用大倾角非对称屋顶形巷道断面的几何特征,基于巷道围岩塑性区分布规律与合理锚固层位分布特征,进行非均匀锚杆(索)支护设计,有效保障锚杆(索)支护力的发挥的同时,保障巷道围岩的整体稳定。同时,在31233运输巷进行了试验,布设了巷道顶板深部位移与锚索支护力监测站,监测期间顶板变形量在100 mm以内,锚索支护力发挥稳定,围岩整体控制效果较好。 展开更多
关键词 大倾角 极近距离煤层群 重复采动 回采巷道 支护
在线阅读 下载PDF
极近距离煤层合层开采沿空留巷围岩控制技术
7
作者 廖洪波 王平 +4 位作者 吕建华 郭海军 何先文 杨林 赵俊 《能源与环保》 2025年第3期258-263,共6页
针对极近距离煤层群合层开采沿空留巷围岩难以控制的实际情况,结合现场调研、理论分析等手段,探讨了沿空巷道围岩变形机理,提出沿空留巷原理与技术,进行了工程实践。结果表明,非均匀变形的半煤岩体围岩,软弱破碎的复合顶板以及合层开采... 针对极近距离煤层群合层开采沿空留巷围岩难以控制的实际情况,结合现场调研、理论分析等手段,探讨了沿空巷道围岩变形机理,提出沿空留巷原理与技术,进行了工程实践。结果表明,非均匀变形的半煤岩体围岩,软弱破碎的复合顶板以及合层开采强烈的开采扰动是造成极近距离薄煤层合层开采沿空留巷围岩支护困难的主要原因;建立了沿空留巷理论模型;提出了“切顶卸压→应力再平衡,支护体与支撑体协同承载→结构再稳定”的控制原理;形成了“超前加强顶帮支护+切顶卸压+钢管混凝土柱+11号矿工钢+采后巷道分区域加强支护”的沿空留巷技术。工程实践表明,该技术能有效控制小河嘴煤矿-12110运输巷沿空留巷围岩的稳定。 展开更多
关键词 极近距离煤层 合层开采 沿空留巷 围岩控制
在线阅读 下载PDF
近距离煤层开采覆岩裂隙活化特征与隔水层稳定性
8
作者 曹健 苏海涛 +3 位作者 王超 李建伟 李亮 毛旭魏 《煤田地质与勘探》 北大核心 2025年第4期153-167,共15页
【背景】陕北侏罗纪煤田近距离煤层重复采动覆岩裂隙活化发育加剧,易导致隔水层失稳,引起地下水流失。【方法】为揭示近距离煤层开采覆岩裂隙发育特征及隔水层稳定性,采用实测统计、物理相似模拟及理论分析相结合的方法,提出基于陕北侏... 【背景】陕北侏罗纪煤田近距离煤层重复采动覆岩裂隙活化发育加剧,易导致隔水层失稳,引起地下水流失。【方法】为揭示近距离煤层开采覆岩裂隙发育特征及隔水层稳定性,采用实测统计、物理相似模拟及理论分析相结合的方法,提出基于陕北侏罗纪煤田近距离煤层保水开采的主要煤岩组合类型划分,分析重复采动裂隙活化发育规律,建立重复采动隔水层稳定性判据。【结果和结论】研究表明,依据该煤田上部近距离两层可采煤层煤-水赋存条件及地质特征,可分为薄及中厚-厚型(Ⅰ型)、厚-薄及中厚型(Ⅱ型)、厚-厚型(Ⅲ型)、薄及中厚-薄及中厚型(Ⅳ型)4种类型。得出基于上述4类条件采动覆岩上行与下行裂隙发育的隔水层破坏特征,重复采动裂采比(上行裂隙发育高度/复合采高)一般为14~30,相比上部单一煤层开采显著减小,下行裂隙发育深度为复合采高的1.6~3.0倍。建立基于重复采动裂隙发育高度(深度)的隔水层稳定性判据,当隔水层厚度大于等于重复采动裂隙发育高度、深度、安全厚度之和时,隔水层稳定,反之失稳;给出陕北侏罗纪煤田重复采动隔水层稳定性评价,包括稳定-稳定、稳定-失稳、失稳-失稳3种情况。研究成果可为陕北侏罗纪煤田近距离煤层保水开采的隔水层稳定性判据确定与控制提供理论基础。 展开更多
关键词 近距离煤层 覆岩裂隙 裂隙活化 隔水层破坏 稳定性判据
在线阅读 下载PDF
取样钻孔孔底煤层瓦斯排放带数值模拟
9
作者 郑玉岐 孙四清 +2 位作者 杨帆 吴晓眩 张庆利 《煤矿安全》 北大核心 2025年第3期44-53,共10页
针对煤矿井下密闭取样无心钻进长度难以确定这一难题,分析钻孔孔底煤层瓦斯涌出规律,建立流-固耦合模型,模拟分析煤层初始渗透率、煤层初始瓦斯压力、钻孔直径、煤壁暴露时间对钻孔孔底煤层瓦斯排放带长度的影响;拟合得出钻孔孔底煤层... 针对煤矿井下密闭取样无心钻进长度难以确定这一难题,分析钻孔孔底煤层瓦斯涌出规律,建立流-固耦合模型,模拟分析煤层初始渗透率、煤层初始瓦斯压力、钻孔直径、煤壁暴露时间对钻孔孔底煤层瓦斯排放带长度的影响;拟合得出钻孔孔底煤层瓦斯排放带长度预测方程。结果表明:在不同的排放时间段内,钻孔孔底煤层瓦斯排放带内煤层瓦斯压力均为先快速增长、后趋于稳定;在同一煤层条件下,煤壁暴露时间越长,形成钻孔孔底煤层瓦斯排放带长度越长;煤层初始瓦斯压力是影响钻孔孔底煤层瓦斯排放带长度的重要因素;钻孔直径的增大能够使更远处的瓦斯进行排放,使钻孔孔底煤层瓦斯排放带的长度增加;煤层初始渗透率增大能够影响钻孔孔底煤层瓦斯排放带长度增长,但煤层内的瓦斯量为定值,因此钻孔孔底煤层瓦斯排放带的长度有极限值;采用偏最小二乘法分析得出的对钻孔孔底煤层瓦斯排放带长度影响程度从强到弱依次为煤层初始瓦斯压力、煤壁暴露时间、煤层初始渗透率、钻孔直径。 展开更多
关键词 瓦斯抽采 密闭取样 流-固耦合 煤层瓦斯涌出规律 偏最小二乘法 瓦斯排放带长度
在线阅读 下载PDF
近距离煤层动压掘进巷道围岩应力与变形特征研究
10
作者 张雷 俸纲桃 《安全》 2025年第2期84-88,共5页
为掌握近距离煤层动压掘进巷道围岩应力与变形特征,以某煤矿典型的近距离煤层3号和6号煤层为工程背景,通过室内力学试验和理论计算确定近距离煤层回采巷道围岩稳定性分类,借助FLAC^(3D)软件,模拟了6号煤层的6303轨道顺槽和6303胶带顺槽... 为掌握近距离煤层动压掘进巷道围岩应力与变形特征,以某煤矿典型的近距离煤层3号和6号煤层为工程背景,通过室内力学试验和理论计算确定近距离煤层回采巷道围岩稳定性分类,借助FLAC^(3D)软件,模拟了6号煤层的6303轨道顺槽和6303胶带顺槽在受动压影响下巷道掘进过程的围岩应力与变形特征。研究结果表明:近距离煤层3号和6号回采巷道围岩均为中等稳定围岩;6303轨道顺槽、6303胶带顺槽均在与邻近回采工作面交锋时受动压影响最大,垂直应力分别达到7.9、6.3 MPa,顶板下沉量分别增至120、156 mm,底臌量分别达87、57 mm。研究结果可为后续制定合理的巷道支护方案提供较好的参考价值,确保巷道施工安全。 展开更多
关键词 近距离煤层 动压掘进 回采巷道 应力 位移
在线阅读 下载PDF
浅埋近距离煤层开采上覆房式煤柱破坏规律及稳定性控制研究
11
作者 李鹏杰 杨峰 +2 位作者 陈海富 高嘉良 赵瑞 《煤矿安全》 北大核心 2025年第3期167-176,共10页
为研究浅埋近距离上覆房式采空区下开采煤柱失稳破坏问题,提出了煤柱稳定性控制方法,采用充填材料力学特性测试试验和FLAC^(3D)数值模拟相结合的方法进行研究。研究表明:风积沙充填材料压实试验压力达15 MPa时,基本达到密实状态;风积沙... 为研究浅埋近距离上覆房式采空区下开采煤柱失稳破坏问题,提出了煤柱稳定性控制方法,采用充填材料力学特性测试试验和FLAC^(3D)数值模拟相结合的方法进行研究。研究表明:风积沙充填材料压实试验压力达15 MPa时,基本达到密实状态;风积沙-黄土混合材料力学特性测试表明配比为风积沙∶黄土=1∶0.4时形变量较小,抗压能力强,并将该配比作为2305工作面固体充填材料配比;2305工作面采用垮落法开采时,煤柱发生大面积整体破坏,煤柱整体破坏率为93.7%;采用充实率为40%、60%、80%的固体充填开采时煤柱的整体破坏率分别为88.6%、14.9%、11.4%,结合研究结果充实率为60%时即可有效控制上覆采空区煤柱整体稳定。 展开更多
关键词 近距离煤层 房式采空区 煤柱失稳破坏 煤柱稳定性 固体充填采煤
在线阅读 下载PDF
煤巷快速掘进空顶留设距离与支护技术研究
12
作者 袁立 《陕西煤炭》 2025年第1期14-18,共5页
为研究在巷道掘进期间合理空顶留设对围岩变形破坏规律及巷道掘进效率的影响,以韩城矿区下峪口煤矿为工程背景,通过采用理论分析、数值模拟及现场试验的方法,对23302进顺工作面进行合理空顶距留设及支护方案优化,从而提高掘进进尺。通... 为研究在巷道掘进期间合理空顶留设对围岩变形破坏规律及巷道掘进效率的影响,以韩城矿区下峪口煤矿为工程背景,通过采用理论分析、数值模拟及现场试验的方法,对23302进顺工作面进行合理空顶距留设及支护方案优化,从而提高掘进进尺。通过研究得出,基于近距离煤层顶板力学特征及岩层岩性,采用薄板理论,建立空顶区顶板力学模型,计算得到最大空顶距为5.86 m;将巷道支护方案优化为顶部锚杆间排距为750 mm×1000 mm,每排7根,取消帮部梯子梁;通过现场得出月进尺是原支护的143%,采用优化后的支护方案可以节省支护时间,实现了巷道安全快速掘进,可为类似条件矿井安全高效生产提供参考经验。 展开更多
关键词 近距离煤层 快速掘进 空顶距 支护设计
在线阅读 下载PDF
近距离煤层采空区下沿空留巷顶板结构控制与合理巷旁支护研究
13
作者 褚心瑜 崔海峰 +2 位作者 李振安 高海滨 朱凌卓 《中国煤炭》 北大核心 2025年第2期45-58,共14页
为实现近距离煤层采空区安全沿空留巷,解决巷道围岩变形严重难题,以山东新查庄矿业有限责任公司采空区下91006工作面的沿空留巷工程为背景,采用理论分析及现场工业性试验等研究手段,研究了基本顶破断规律与应力演化规律,建立了近距离煤... 为实现近距离煤层采空区安全沿空留巷,解决巷道围岩变形严重难题,以山东新查庄矿业有限责任公司采空区下91006工作面的沿空留巷工程为背景,采用理论分析及现场工业性试验等研究手段,研究了基本顶破断规律与应力演化规律,建立了近距离煤层沿空留巷顶板力学模型,并利用结构力学理论和矿压理论计算分析出基本顶岩层在不同位态下的巷旁支护阻力计算公式,通过对比分析水力压裂断顶卸压前后巷旁支护阻力变化发现水力压裂断顶卸压大大降低了巷旁支承压力,并在91006工作面采用“水力压裂超前断顶卸压+钢管混凝土墩柱高强巷旁支护”组合技术方案开展现场工业性实验,结果显示巷道顶底板变形量稳定,整体留巷成型效果良好。 展开更多
关键词 近距离煤层 沿空留巷 顶板运动规律 断顶卸压 巷旁支护阻力
在线阅读 下载PDF
磁窑沟煤矿近距离煤层综采面过构造施工工艺研究
14
作者 姚俊彪 《山东煤炭科技》 2025年第2期27-31,37,共6页
11103工作面为磁窑沟矿11号煤层圈定的最后一个长壁综采工作面,该工作面推采至920m位置时,受地垒构造影响,大范围大断面割砂岩,正常回采受阻。针对11103工作面割矸范围及断面大、砂岩坚硬截齿难破裂、局部区域顶板破碎易漏顶、跳采准备... 11103工作面为磁窑沟矿11号煤层圈定的最后一个长壁综采工作面,该工作面推采至920m位置时,受地垒构造影响,大范围大断面割砂岩,正常回采受阻。针对11103工作面割矸范围及断面大、砂岩坚硬截齿难破裂、局部区域顶板破碎易漏顶、跳采准备及搬家倒面影响时间较长的实际情况,磁窑沟矿从回风顺槽探测分析工作面构造赋存及变化情况,采用爆破+机割回采工艺,通过优化现场人员劳动组织、对比分析矸石深孔与浅孔爆破施工效果、制定甩矸及顶板管控等调整措施顺利通过构造区域。实践证明,通过地垒构造区域采用浅孔预裂爆破+机割进行回采,可减少坚硬矸石对回采影响,保证矿井产量及正常接续,为类似矿井解决相关问题提供借鉴。 展开更多
关键词 近距离煤层 地垒 砂岩 漏顶 爆破
在线阅读 下载PDF
近距离煤层开采覆岩垮落与裂隙演化规律数值模拟研究
15
作者 徐鹏宇 《晋控科学技术》 2025年第2期1-4,共4页
为保障近距离煤层群高瓦斯矿井安全高效开采,结合山西寿阳潞阳祥升煤矿3#煤和6#煤工程背景,采用PFC数值模拟软件,模拟3#煤层、6#煤层开采覆岩的垮落和裂隙变化情况。结果表明,3#煤层工作面垮落带高度为10.4 m,裂隙带高度为41.5 m;6#煤... 为保障近距离煤层群高瓦斯矿井安全高效开采,结合山西寿阳潞阳祥升煤矿3#煤和6#煤工程背景,采用PFC数值模拟软件,模拟3#煤层、6#煤层开采覆岩的垮落和裂隙变化情况。结果表明,3#煤层工作面垮落带高度为10.4 m,裂隙带高度为41.5 m;6#煤层工作面垮落带高度为14.7 m,裂隙带高度为56.7 m。6#煤层开采过程中,采空区上覆岩层将发生直接破断并延伸至上部煤层的采空区内,从而引发3#煤层裂隙带的二次发育。 展开更多
关键词 近距离煤层 垮落带 裂隙 数值模拟
在线阅读 下载PDF
基于减压区开采理论的浅埋煤层群同采工作面合理错距研究
16
作者 高宏伟 《陕西煤炭》 2025年第1期10-13,共4页
为提高煤层开采效率,采用理论分析和数值计算相结合的方法确定了赵家梁煤矿浅埋煤层群同采时上下工作面的合理错距。采用减压区开采理论分析得出了赵家梁煤矿4^(-2上)和5^(-2)煤层同采时工作面合理错距范围在22.6~32.6 m;通过数值计算得... 为提高煤层开采效率,采用理论分析和数值计算相结合的方法确定了赵家梁煤矿浅埋煤层群同采时上下工作面的合理错距。采用减压区开采理论分析得出了赵家梁煤矿4^(-2上)和5^(-2)煤层同采时工作面合理错距范围在22.6~32.6 m;通过数值计算得出,同采煤层错距较小时,4^(-2上)煤层与5^(-2)煤层超前支压应力场叠加效应会对同采煤层产生较大影响,下部煤层工作面前方出现“应力增高区”“应力降低区”和“应力增高区”;同采错距在30~35 m范围时采场的应力集中程度较小。 展开更多
关键词 浅埋煤层 近距离 合理错距 数值模拟
在线阅读 下载PDF
近距离煤层重复采动裂隙场判别工程试验研究
17
作者 张文柯 《煤炭技术》 2025年第3期70-73,共4页
为了掌握采动覆岩经历二次扰动后覆岩裂隙演化发育的特征,以下石节煤矿222下工作面和2301上采空区工程为研究对象,通过采用高精度ESG微震监测系统,对重复采动条件下222工作面采动覆岩的微震事件进行监测,分析工作面覆岩裂隙三维空间分... 为了掌握采动覆岩经历二次扰动后覆岩裂隙演化发育的特征,以下石节煤矿222下工作面和2301上采空区工程为研究对象,通过采用高精度ESG微震监测系统,对重复采动条件下222工作面采动覆岩的微震事件进行监测,分析工作面覆岩裂隙三维空间分布特征。确定了222工作面裂隙带的具体范围以及层位,裂隙带高度为64~151 m。覆岩空间微破裂前后分布范围在200 m内,确定了采动裂隙场的基本范围,为后续瓦斯治理、巷道支护提供数据支撑。 展开更多
关键词 微震监测 近距离煤层 裂隙演化 重复采动
在线阅读 下载PDF
极近距离煤层开采覆岩运移特征及变形机理研究
18
作者 李健光 卫政宇 《煤炭与化工》 2025年第3期17-22,26,共7页
以华苑煤业9103和10103工作面的极近距离煤层开采为研究背景,采用相似材料模拟试验的方法,深入分析了上、下煤层联合开采时覆岩的裂缝演化规律和移动变形特征。研究结果表明,随着工作面的不断推进,覆岩裂缝的演化经历了初期稳定、中期... 以华苑煤业9103和10103工作面的极近距离煤层开采为研究背景,采用相似材料模拟试验的方法,深入分析了上、下煤层联合开采时覆岩的裂缝演化规律和移动变形特征。研究结果表明,随着工作面的不断推进,覆岩裂缝的演化经历了初期稳定、中期加速扩展、后期趋于稳定3个阶段,且顶板覆岩的下沉变形也呈现出相似的阶段性特征。在初期阶段,裂缝发育缓慢,顶板相对稳定;中期阶段,裂缝迅速扩展,顶板下沉量剧增;后期阶段,裂缝发育和顶板下沉均趋于稳定。本研究揭示了极近距离煤层开采过程中覆岩的运移规律和变形机制,为优化巷道布置设计、提高煤矿开采效率和安全性提供了重要的科学依据和技术支持。 展开更多
关键词 极近距离煤层 相似模型 覆岩运动 裂隙
在线阅读 下载PDF
上一页 1 2 62 下一页 到第
使用帮助 返回顶部