期刊文献+
共找到574篇文章
< 1 2 29 >
每页显示 20 50 100
Effect of burial depth of a new tunnel on the seismic response of an existing tunnel
1
作者 Ma Runbo Cao Qikun +3 位作者 Lu Shasha Zhao Dongxu Zhang Yanan Xu Hong 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2024年第4期863-882,共20页
Burial depth is a crucial factor affecting the forces and deformation of tunnels during earthquakes.One key issue is a lack of understanding of the effect of a change in the buried depth of a single-side tunnel on the... Burial depth is a crucial factor affecting the forces and deformation of tunnels during earthquakes.One key issue is a lack of understanding of the effect of a change in the buried depth of a single-side tunnel on the seismic response of a double-tunnel system.In this study,shaking table tests were designed and performed based on a tunnel under construction in Dalian,China.Numerical models were established using the equivalent linear method combined with ABAQUS finite element software to analyze the seismic response of the interacting system.The results showed that the amplification coefficient of the soil acceleration did not change evidently with the burial depth of the new tunnel but decreased as the seismic amplitude increased.In addition,the existing tunnel acceleration,earth pressure,and internal force were hardly affected by the change in the burial depth;for the new tunnel,the acceleration and internal force decreased as the burial depth increased,while the earth pressure increased.This shows that the earth pressure distribution in a double-tunnel system is relatively complex and mainly concentrated on the arch spandrel and arch springing of the relative area.Overall,when the horizontal clearance between the center of the two tunnels was more than twice the sum of the radius of the outer edges of the two tunnels,the change in the burial depth of the new tunnel had little effect on the existing one,and the tunnel structure was deemed safe.These results provide a preliminary understanding and reference for the seismic performance of a double-tunnel system. 展开更多
关键词 burial depth new tunnel existing tunnel seismic response shaking table tests numerical simulations
在线阅读 下载PDF
Evaluation of new Austrian tunnelling method applied to Bolu tunnel’s weak rocks 被引量:6
2
作者 Ebu Bekir Aygar 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2020年第3期541-556,共16页
Since the development of the new Austrian tunnelling method(NATM)in the 1960s,this technique has been applied successfully in many tunnels.However,opinions of NATM principles emerged till 2000,i.e.NATM is not a tunnel... Since the development of the new Austrian tunnelling method(NATM)in the 1960s,this technique has been applied successfully in many tunnels.However,opinions of NATM principles emerged till 2000,i.e.NATM is not a tunnelling method,but an approach covering all general principles of tunnelling.To investigate the general principles of the NATM,this study focused on tunnelling practises in the Bolu tunnel,and evaluated the conditions under which the NATM practises could be effective.The Bolu tunnel project was designed following the NATM principles.It is evident that practises adopted in this tunnel are important with respect to the NATM.In addition,it shows that the solutions to the problems encountered in this tunnel are consistent with the NATM principles.Finally,the study determines the ground types of the NATM principles and proposes associated updates. 展开更多
关键词 Bolu tunnel new Austrian tunnelling method(NATM) Support types
在线阅读 下载PDF
New technologies for high-risk tunnel construction in GuiyangGuangzhou high-speed railway 被引量:2
3
作者 Yubao Zhao Shougen Chen +1 位作者 Xinrong Tan Ma Hui 《Journal of Modern Transportation》 2013年第4期258-265,共8页
Based on the construction of high risk tunnels in Guiguang-Guangzhou high-speed railway, several new technologies were developed for high-risk tunnel con- struction. First, an integrated advanced geological predic- ti... Based on the construction of high risk tunnels in Guiguang-Guangzhou high-speed railway, several new technologies were developed for high-risk tunnel con- struction. First, an integrated advanced geological predic- tion was developed for tunneling in karst area. Then, a new system of ventilation by involving the dedusting technol- ogy was proposed and used in the field, which received a good air quality. Finally, a method to minimize the dis- tance between the working face and the invert installation was proposed by optimizing the invert installation and adopting the micro bench method. Applying the method to the project obtained an excellent result. The achievement obtained for this study would be able to provide a valuable reference to similar projects in the future. 展开更多
关键词 tunneling engineering High-speed railway new technologies High-risk tunnel
在线阅读 下载PDF
新建隧道正交下穿既有城市道路稳定性研究
4
作者 郭郅威 《科学技术创新》 2025年第1期182-185,共4页
为了评估新建隧道正交下穿既有城市道路的稳定性,本文通过分析货车车辆荷载作用下不同覆土厚度对隧道安全系数的影响,探讨了隧道与既有道路之间的相互影响机制。研究表明,当覆土厚度较浅时,隧道安全系数保持在安全水平以上,并随覆土厚... 为了评估新建隧道正交下穿既有城市道路的稳定性,本文通过分析货车车辆荷载作用下不同覆土厚度对隧道安全系数的影响,探讨了隧道与既有道路之间的相互影响机制。研究表明,当覆土厚度较浅时,隧道安全系数保持在安全水平以上,并随覆土厚度增加而上升,至5.72 m时达到峰值。随后,随覆土厚度进一步增加,安全系数虽有所下降但幅度较小。这表明隧道在正交下穿城市道路时具有良好的稳定性,但在浅覆土条件下与既有道路相互作用较为强烈。研究为隧道设计与施工提供了重要参考。 展开更多
关键词 新建 隧道 正交 下穿 既有 城市道路
在线阅读 下载PDF
盾构隧道下穿既有隧道保护方案优化分析
5
作者 龚云强 张委定 杨巧玲 《广东土木与建筑》 2025年第1期108-112,共5页
盾构下穿既有隧道会产生明显的扰动影响,存在较大施工风险,需要进行控制保护。依托某近距离下穿既有隧道的盾构隧道工程,建立了MJS水平加固、管棚注浆加固、地面袖阀管注浆加固3种方案的三维有限元模型,分析了不同加固方案下既有隧道的... 盾构下穿既有隧道会产生明显的扰动影响,存在较大施工风险,需要进行控制保护。依托某近距离下穿既有隧道的盾构隧道工程,建立了MJS水平加固、管棚注浆加固、地面袖阀管注浆加固3种方案的三维有限元模型,分析了不同加固方案下既有隧道的水平位移、竖向位移变化特征,并从变形控制、工法缺点、可实施性、费用方面进行了比较分析,确定了最优加固方案。研究结果表明:既有隧道以竖向位移为主,是变形控制关键指标;MJS水平加固对既有隧道位移控制效果最有利,地面袖阀管注浆加固效果最差;综合多方面因素,管棚注浆加固为最优保护方案;加固处理后土体强度得到改善,右线盾构隧道施工对既有隧道最大位移量和位置影响不大;双线开挖面距离在2.5倍洞径以上,施工扰动性可一定程度降低。结论可为相似下穿工程提供借鉴与参考。 展开更多
关键词 新建隧道 既有隧道 加固 MJS水平加固 管棚 袖阀管
在线阅读 下载PDF
明挖隧道衬砌分体施工技术研究
6
作者 李林 《凿岩机械气动工具》 2025年第3期132-134,共3页
研究和应用明挖隧道衬砌分体施工技术可充分提高地下工程体系转化技术应用水平,使用新型分体式衬砌模板台车可促进明挖隧道衬砌施工技术的进步,改善传统的施工方法。基于此,文章详细分析了分体式衬砌模板台车的施工原理、步骤,以及安装... 研究和应用明挖隧道衬砌分体施工技术可充分提高地下工程体系转化技术应用水平,使用新型分体式衬砌模板台车可促进明挖隧道衬砌施工技术的进步,改善传统的施工方法。基于此,文章详细分析了分体式衬砌模板台车的施工原理、步骤,以及安装注意事项。研究表明,明挖隧道衬砌分体施工技术不仅加快了建设进度,提高了建设质量,还提升了工程效率,进一步改善了劳动条件,确保了施工人员的安全,为隧道衬砌施工领域带来了显著的技术革新。 展开更多
关键词 衬砌分体施工技术 明挖隧道 新型衬砌分体式模板台车
在线阅读 下载PDF
Geotechnical investigations and remediation design for failure of tunnel portal section: a case study in northern Turkey 被引量:7
7
作者 Ayberk KAYA Kadir KARAMAN Fikri BULUT 《Journal of Mountain Science》 SCIE CSCD 2017年第6期1140-1160,共21页
Mass movements are very common problems in the eastern Black Sea region of Turkey due to its climate conditions, geological, and geomorphological characteristics. High slope angle, weathering, dense rainfalls, and ant... Mass movements are very common problems in the eastern Black Sea region of Turkey due to its climate conditions, geological, and geomorphological characteristics. High slope angle, weathering, dense rainfalls, and anthropogenic impacts are generally reported as the most important triggering factors in the region. Following the portal slope excavations in the entrance section of Cankurtaran tunnel, located in the region, where the highly weathered andesitic tuff crops out, a circular toe failure occurred. The main target of the present study is to investigate the causes and occurrence mechanism of this failure and to determine the feasible remedial measures against it using finite element method(FEM) in four stages. These stages are slope stability analyses for pre-and postexcavation cases, and remediation design assessments for slope and tunnel. The results of the FEM-SSR analyses indicated that the insufficient initial support design and weathering of the andesitic tuffs are the main factors that caused the portal failure. After installing a rock retaining wall with jet grout columns and reinforced slope benching applications, the factor of safety increased from 0.83 to 2.80. In addition toslope stability evaluation, the Rock Mass Rating(RMR), Rock Mass Quality(Q) and New Austrian Tunneling Method(NATM) systems were also utilized as empirical methods to characterize the tunnel ground and to determine the tunnel support design. The performance of the suggested empirical support design, induced stress distributions and deformations were analyzed by means of numerical modelling. Finally, it was concluded that the recommended stabilization technique was essential for the dynamic long-term stability and prevents the effects of failure. Additionally, the FEM method gives useful and reasonably reliable results in evaluating the stability of cut slopes and tunnels excavated both in continuous and discontinuous rock masses. 展开更多
关键词 Portal failure Stability analysis Finite element method tunnel support design Remedial measures Rock Mass Rating(RMR) Rock Mass Quality(Q) new Austrian tunneling Method(NATM)
在线阅读 下载PDF
Estimation of convergence of a high-speed railway tunnel in weak rocks using an adaptive neuro-fuzzy inference system(ANFIS) approach 被引量:1
8
作者 A.C.Adoko Li Wu 《Journal of Rock Mechanics and Geotechnical Engineering》 2012年第1期11-18,共8页
Estimation of tunnel diameter convergence is a very important issue for tunneling construction,especially when the new Austrian tunneling method(NATM) is adopted.For this purpose,a systematic convergence measurement... Estimation of tunnel diameter convergence is a very important issue for tunneling construction,especially when the new Austrian tunneling method(NATM) is adopted.For this purpose,a systematic convergence measurement is usually implemented to adjust the design during the whole construction,and consequently deadly hazards can be prevented.In this study,a new fuzzy model capable of predicting the diameter convergences of a high-speed railway tunnel was developed on the basis of adaptive neuro-fuzzy inference system(ANFIS) approach.The proposed model used more than 1 000 datasets collected from two different tunnels,i.e.Daguan tunnel No.2 and Yaojia tunnel No.1,which are part of a tunnel located in Hunan Province,China.Six Takagi-Sugeno fuzzy inference systems were constructed by using subtractive clustering method.The data obtained from Daguan tunnel No.2 were used for model training,while the data from Yaojia tunnel No.1 were employed to evaluate the performance of the model.The input parameters include surrounding rock masses(SRM) rating index,ground engineering conditions(GEC) rating index,tunnel overburden(H),rock density(?),distance between monitoring station and working face(D),and elapsed time(T).The model’s performance was assessed by the variance account for(VAF),root mean square error(RMSE),mean absolute percentage error(MAPE) as well as the coefficient of determination(R2) between measured and predicted data as recommended by many researchers.The results showed excellent prediction accuracy and it was suggested that the proposed model can be used to estimate the tunnel convergence and convergence velocity. 展开更多
关键词 tunnel convergence prediction new Austrian tunneling method (NATM) adaptive neurc -fuzzy inference system(ANF1S) subtractive clustering
在线阅读 下载PDF
Conception and Exploration of Using Data as a Service in Tunnel Construction with the NATM 被引量:5
9
作者 Bowen Du Yanliang Du +1 位作者 Fei Xu Peng He 《Engineering》 2018年第1期123-130,共8页
The New Austrian Tunneling Method (NATM) has been widely used in the construction of mountain tun- nels, urban metro lines, underground storage tanks, underground power houses, mining roadways, and so on, The variat... The New Austrian Tunneling Method (NATM) has been widely used in the construction of mountain tun- nels, urban metro lines, underground storage tanks, underground power houses, mining roadways, and so on, The variation patterns of advance geological prediction data, stress-strain data of supporting struc- tures, and deformation data of the surrounding rock are vitally important in assessing the rationality and reliability of construction schemes, and provide essential information to ensure the safety and scheduling of tunnel construction, However, as the quantity of these data increases significantly, the uncertainty and discreteness of the mass data make it extremely difficult to produce a reasonable con- struction scheme; they also reduce the forecast accuracy of accidents and dangerous situations, creating huge challenges in tunnel construction safety, In order to solve this problem, a novel data service system is proposed that uses data-association technology and the NATM, with the support of a big data environ- ment, This system can integrate data resources from distributed monitoring sensors during the construc- tion process, and then identify associations and build relations among data resources under the same construction conditions, These data associations and relations are then stored in a data pool, With the development and supplementation of the data pool, similar relations can then he used under similar con- ditions, in order to provide data references for construction schematic designs and resource allocation, The proposed data service system also provides valuable guidance for the construction of similar projects. 展开更多
关键词 new Austrian tunneling Method Big DATA environments DATA AS a SERVICE tunnel CONSTRUCTION
在线阅读 下载PDF
Excavation of Inlet Tunnels at Geheyan Power Station
10
作者 LIU Li xinEngineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010,China CHANG Han junEngineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010,China 《人民长江》 北大核心 2001年第S1期21-22,共2页
The Geheyan Power Station on the Qingjiang river has four inlet tunnels, on the right bank, with its excavation diameter of 11.3 m to 12.5 m, after lining diameter of 9.5 m, axis to axis spacing of 24 m. The thickness... The Geheyan Power Station on the Qingjiang river has four inlet tunnels, on the right bank, with its excavation diameter of 11.3 m to 12.5 m, after lining diameter of 9.5 m, axis to axis spacing of 24 m. The thickness of the pillar between tunnels should usually be more than two times of tunnel diameter to ensure the stability of surrounding rock during excavation. In this paper, the excavation methods of tunnels with the pillar thickness as small as the tunnel diameter, such as smooth surface blasting, shotcrete support protection, are emphatically discussed. 展开更多
关键词 POWER tunnel adjacent tunnel EXCAVATION new Austrian tunnelLING method GEHEYAN POWER Station
在线阅读 下载PDF
Kerr-Newman-Kasuya双荷黑洞隧穿辐射的改进新研究
11
作者 冯相栏 蒋青权 《西华师范大学学报(自然科学版)》 2021年第1期42-47,共6页
本文首先通过坐标变换得到了新的Kerr-Newman-Kasuya双荷黑洞解形式。然后运用Euler-Lagrange变分原理,在一般坐标系下对Kerr-Newman-Kasuya双荷黑洞的类时和类光测地线方程作了新的统一推导,并利用Parikh-Wilczek建议的半经典隧穿方法... 本文首先通过坐标变换得到了新的Kerr-Newman-Kasuya双荷黑洞解形式。然后运用Euler-Lagrange变分原理,在一般坐标系下对Kerr-Newman-Kasuya双荷黑洞的类时和类光测地线方程作了新的统一推导,并利用Parikh-Wilczek建议的半经典隧穿方法,对有质量带电粒子在Kerr-Newman-Kasuya双荷黑洞视界附近的隧穿辐射作了新的研究,通过计算得到其隧穿几率。研究表明Kerr-Newman-Kasuya双荷黑洞这一类转动黑洞的隧穿辐射可以在一般坐标系下进行分析。 展开更多
关键词 Kerr-newman-Kasuya双荷黑洞 隧穿辐射 度规新形式 测地线方程 隧穿几率
在线阅读 下载PDF
利用已建隧道剩余空间安装管道方案探究
12
作者 朱海瑞 《化工管理》 2024年第8期165-168,共4页
某工程利用已建隧道剩余空间安装D1219 mm管道,已建隧道内已安装有一条D1016 mm管道,剩余空间有限、狭小、隧道内管道安装作业十分困难,考虑到已建隧道设计之初按照安装两条管道进行断面设计。本着节约投资、节省工期、充分利用已有管... 某工程利用已建隧道剩余空间安装D1219 mm管道,已建隧道内已安装有一条D1016 mm管道,剩余空间有限、狭小、隧道内管道安装作业十分困难,考虑到已建隧道设计之初按照安装两条管道进行断面设计。本着节约投资、节省工期、充分利用已有管道资源的原则,开展了受限剩余空间内安装已建管道方案设计。该方案在隧道进口外部完成管道运布管、对口、组焊、无损检测和防腐补口等工作,在隧道出口外部设置管道牵引系统将管道牵引就位,实现已建隧道内管道安装。该工程利用已建隧道剩余空间,在隧道外部完成管道焊接组装,通过管道发送系统完成管道就位安装,不仅节省了新建隧道的问题,而且缩短了工程工期,为今后在已建隧道内新增管道敷设提供了参考。 展开更多
关键词 已建隧道 剩余空间 管道安装 新建隧道
在线阅读 下载PDF
考虑隧道掘进过程的新建隧道下穿既有隧道力学响应研究 被引量:3
13
作者 于霖 李宇杰 +3 位作者 王晓军 张顶立 叶利宾 杨硕 《铁道标准设计》 北大核心 2024年第3期141-152,共12页
为有效评估新建隧道下穿施工对既有隧道的影响,确保既有隧道运营安全,将既有隧道简化为放置在Pasternak地基模型上的Euler-Bernoulli梁,基于两阶段分析法提出新建隧道下穿施工引起既有隧道力学响应的计算方法。通过与现场监测和既有方... 为有效评估新建隧道下穿施工对既有隧道的影响,确保既有隧道运营安全,将既有隧道简化为放置在Pasternak地基模型上的Euler-Bernoulli梁,基于两阶段分析法提出新建隧道下穿施工引起既有隧道力学响应的计算方法。通过与现场监测和既有方法的结果进行对比,验证了本文方法的准确性。研究结果表明:当新建隧道开挖面位于既有隧道中点时,既有隧道差异沉降达到最大值,转角曲线关于既有隧道中心线对称;在新建隧道掘进过程中,既有隧道的最大正弯矩和最大负弯矩分别出现在既有隧道长度的2/5和3/5位置附近,最大负剪力出现在既有隧道中点处;当新建隧道开挖面到达既有隧道长度的1/4和3/4位置时既有隧道产生最大正剪力;随着隧道轴线夹角和相对弯曲刚度增大,既有隧道的内力显著增大;增大隧道竖向净距有利于控制既有隧道的力学响应。本文方法考虑了新建隧道掘进过程和新建隧道与既有隧道的不同相对位置,可为类似穿越工程风险防控提供理论依据。 展开更多
关键词 新建隧道 下穿施工 既有隧道 力学响应 隧道掘进过程 相对位置
在线阅读 下载PDF
公路隧道场景下的新能源汽车火灾风险评价方法研究
14
作者 付立家 文龙 +1 位作者 卫佳 万利 《重庆理工大学学报(自然科学)》 CAS 北大核心 2024年第9期164-173,共10页
为有效评价公路隧道场景下的新能源汽车火灾风险,解决目前公路隧道火灾评价存在的指标考虑不足、权重确定困难、评价等级界定不清的问题。根据安全学原理,结合新能源汽车火灾致因,从“人-机-环-管”4个方面构建了公路隧道新能源汽车火... 为有效评价公路隧道场景下的新能源汽车火灾风险,解决目前公路隧道火灾评价存在的指标考虑不足、权重确定困难、评价等级界定不清的问题。根据安全学原理,结合新能源汽车火灾致因,从“人-机-环-管”4个方面构建了公路隧道新能源汽车火灾风险评价指标体系。利用决策模型和欧式距离函数,将层次分析法(AHP)主观权重和熵权法客观权重利用组合赋权的方法有效结合,得到更为合理的组合权重。最后利用组合赋权-物元可拓模型对南京定淮门隧道新能源汽车火灾风险进行评价,所得级别变量特征值为1.646,确定该隧道风险等级结果为Ⅱ级,与工程实际相符合,验证了该方法的合理性与可靠性。 展开更多
关键词 隧道火灾 风险评价 新能源汽车 组合赋权 物元可拓模型
在线阅读 下载PDF
夏秋绿茶的杀青工艺及加工设备研究 被引量:1
15
作者 杨莹 黄泽界 +2 位作者 何端 冯文颖 龙开进 《现代食品》 2024年第12期110-112,共3页
本项目基于对贵州省夏秋茶的前期研究基础,通过结合先进的加工工艺和高效智能的加工设备可以生产出数量可观的优质绿茶。这种绿茶具有丰富的内含物,耐泡、鲜爽醇厚、香气高雅、汤色亮绿且安全可靠。通过这一项目,可以解决贵州省茶产业... 本项目基于对贵州省夏秋茶的前期研究基础,通过结合先进的加工工艺和高效智能的加工设备可以生产出数量可观的优质绿茶。这种绿茶具有丰富的内含物,耐泡、鲜爽醇厚、香气高雅、汤色亮绿且安全可靠。通过这一项目,可以解决贵州省茶产业能效不足、茶农收入不高等问题。 展开更多
关键词 夏秋绿茶 杀青 新型隧道式高效杀青机
在线阅读 下载PDF
新建隧道上跨既有运营隧道施工要点 被引量:3
16
作者 李玉超 孔令展 +2 位作者 高山 杨晋 李浩然 《建筑技术开发》 2024年第2期119-121,共3页
随着各城市地铁建设的快速发展,交叠隧道越来越多。以往的研究成果多从理论分析、数值模拟以及室内实验等方向展开。广州地铁5号线东延段庙~夏区间工程,新建盾构隧道上跨既有运营13号线,竖向最小间距1.27 m。针对该工况,从出土量控制、... 随着各城市地铁建设的快速发展,交叠隧道越来越多。以往的研究成果多从理论分析、数值模拟以及室内实验等方向展开。广州地铁5号线东延段庙~夏区间工程,新建盾构隧道上跨既有运营13号线,竖向最小间距1.27 m。针对该工况,从出土量控制、掘进参数、注浆参数、盾构姿态4个方面提出了施工控制要点。经与第三方自动化监测数据对比,本案例中采取的施工措施有效。 展开更多
关键词 新建隧道 上跨 既有隧道 施工要点
在线阅读 下载PDF
城市隧道下穿既有建筑的影响模式分析
17
作者 董文超 徐梁 《江西建材》 2024年第5期172-174,共3页
城市中心城区建构筑物密集,新建城市地下隧道下穿既有建筑物的情况增多,为确保既有建构筑物的安全,需对新旧结构之间的相互影响模式进行分析。文中依托某城市新建隧道工程,初步判定施工对周边既有建筑的影响模式,并根据有限元分析软件,... 城市中心城区建构筑物密集,新建城市地下隧道下穿既有建筑物的情况增多,为确保既有建构筑物的安全,需对新旧结构之间的相互影响模式进行分析。文中依托某城市新建隧道工程,初步判定施工对周边既有建筑的影响模式,并根据有限元分析软件,按照国家现行相关行业规范及标准,分析新建隧道工程施工过程及运营状态对既有建构筑物的影响程度,包括既有建筑基础的沉降、沉降差、地表变形三个方面。结果表明,采取合理的工程措施后,新建隧道工程对既有建构筑物的影响较小,且不影响既有建构筑物的正常使用,整体风险可控。 展开更多
关键词 新建隧道工程 既有建构筑物 影响模式 有限元
在线阅读 下载PDF
基于新意法理念的隧道施工方法研究 被引量:1
18
作者 武超毅 孙家军 《科学技术创新》 2024年第1期147-150,共4页
随着我国隧道建设重心的逐步西移,所涉及的工程地质条件和地应力情况愈发复杂,运用传统隧道施工方法存在诸多问题,如难以克服大变形问题、无法在施工过程中精准预测隧道变形特征等。新意法理念为这些问题的解决提供了新的思路。为推广... 随着我国隧道建设重心的逐步西移,所涉及的工程地质条件和地应力情况愈发复杂,运用传统隧道施工方法存在诸多问题,如难以克服大变形问题、无法在施工过程中精准预测隧道变形特征等。新意法理念为这些问题的解决提供了新的思路。为推广新意法施工设计理念,系统性论述了新意法的基本原理及其设计施工相关流程,并在此基础上分析与传统工法相比其优势所在,为相关工作人员提供参考与指导。 展开更多
关键词 隧道工程 新意法 全断面施工 超前核心土
在线阅读 下载PDF
新建隧道施工对既有桥梁安全影响研究 被引量:2
19
作者 曾小广 《交通与运输》 2024年第3期21-25,共5页
为评判新建隧道施工过程中既有桥梁结构安全性能,利用有限元软件,基于地层结构法,建立三维实体仿真模型,解析新建隧道施工过程中,周边围岩及既有桥梁桩基变形规律。研究表明:既有桥梁桩基横向位移和竖向位移随着隧道施工步序开展逐渐增... 为评判新建隧道施工过程中既有桥梁结构安全性能,利用有限元软件,基于地层结构法,建立三维实体仿真模型,解析新建隧道施工过程中,周边围岩及既有桥梁桩基变形规律。研究表明:既有桥梁桩基横向位移和竖向位移随着隧道施工步序开展逐渐增加,通道开挖完成为最不利工况,桩基顺桥向位移随着隧道施工步序开展呈上下来回波动规律,施工过程中,尚需加强关注各工序之间结构的变形和受力。隧道施工过程中,周边围岩及既有桥梁桩基最大水平位移和竖向位移均小于控制指标。研究成果可供此类项目安全评估参考。 展开更多
关键词 新建隧道 既有桥梁 安全评估 围岩
在线阅读 下载PDF
新能源车混入影响下的公路隧道运营通风设计折减系数研究
20
作者 曾弘锐 苏开春 +2 位作者 冷希乔 付锐 郭春 《隧道建设(中英文)》 CSCD 北大核心 2024年第7期1385-1396,I0021-I0032,共24页
为进一步降低隧道运营期能耗,基于国家统计数据及高速公路沿线数据,从时空维度对数据进行分析,并使用多元线性回归对高速公路沿线新能源车混入度数据进行拟合。得到以下结论:1)近年来我国新能源车保有量占比呈高速增长态势,经济发达地... 为进一步降低隧道运营期能耗,基于国家统计数据及高速公路沿线数据,从时空维度对数据进行分析,并使用多元线性回归对高速公路沿线新能源车混入度数据进行拟合。得到以下结论:1)近年来我国新能源车保有量占比呈高速增长态势,经济发达地区的新能源车保有量占比较高,新能源车混入度总体呈现从新能源车保有量占比高水平地区到低水平地区逐渐递减的趋势;2)新能源车混入度与时间和距离中心城市的里程存在明显的线性关系,与时间成正相关性,与里程成负相关性;3)根据新能源车混入度给出新能源车辆混入影响下的公路隧道运营通风设计交通量折减系数计算公式,能通过时间和空间信息预测隧道的交通量折减系数,为隧道设计阶段和运营阶段需风量的折减提供依据。 展开更多
关键词 公路隧道 运营通风 新能源车辆 折减系数 多元线性回归
在线阅读 下载PDF
上一页 1 2 29 下一页 到第
使用帮助 返回顶部