According to the idea of cost control based on the value chain, several important factors are necessary. Firstly, it is necessary to have enough resources, which must be invested to create advantageous value chain bas...According to the idea of cost control based on the value chain, several important factors are necessary. Firstly, it is necessary to have enough resources, which must be invested to create advantageous value chain based on customer value. It is also necessary to be sure of the cost advantage of the value chain. Secondly, the consumption of resources must be reduced as much as possible to enable the smallest operating cost for the value chain and make sure of the cost advantage based on maximum business value or profit. It is a kind of cost control from the whole view of creation and supply of value. In practice, it is also a kind of cost control system based on the value chain. It includes enough control and necessary resource investment from the view of the value creation, and keeps consumption of resources to a reasonable level from the view of the value supply. The main object of the first factor is to construct the advantageous value chain from creating customer value; and the second factor is to strengthen the advantageous value chain from supplying or producing customer value. Therefore it is a new kind of idea to explore this cost control from the whole view of creation and supply of value. It is more profitable for businesses to gain sustainable competitive advantage.展开更多
After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve t...After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.展开更多
In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and e...In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.展开更多
This paper proposes that organizational performance improvement could be achieved through improving the relationship between suppliers and customers. Accordingly, the paper proposes that performance could be improved ...This paper proposes that organizational performance improvement could be achieved through improving the relationship between suppliers and customers. Accordingly, the paper proposes that performance could be improved by properly managing differences (gaps) that are usually found between customers' expectations and of suppliers perception with respect to services delivered. The paper also proposes that gaps in the relationship between customers and suppliers could be analyzed using mapping techniques. The paper points to the possibility of finding perception gaps and expectation gaps in the interrelated value attributes of goods and/or services; namely quality, cost, and time of delivery of goods or services to customers. In addition, the paper suggests that those gaps may impact on the performance from the perspectives of quality, cost, and speed of delivery of the service. It is envisaged that this research could assist management in controlling cost and avoid wastage and improve organizational performance.展开更多
An integrated pest management model of Cost/Benefit analysis strategy was constructed for stem corn borer Sesamia cretica using complementary control measures of different resistant genotypes of corn with the chemical...An integrated pest management model of Cost/Benefit analysis strategy was constructed for stem corn borer Sesamia cretica using complementary control measures of different resistant genotypes of corn with the chemical insecticide diazinon 60%. Based on Cost/Benefit analysis result, the resistant genotype (SAKHA 9433) provides maximum economic value of production at the model point where no spray of insecticide is applied. The applications of one or two sprays do not justify the use of chemical insecticide but rather result in economic loss since the reduction in borer damage value, due to diazinon use, is lower than the cost of control (spray). However, the applications of one spray for the moderate resistant genotype (IPA 2052) and two sprays for the sensitive genotype (CML 323) during corn growing season would be of value to cover the cost of control (spray) but do not achieve similar economic value of revenue comparing with the resistant genotype.展开更多
In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ...In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.展开更多
文摘According to the idea of cost control based on the value chain, several important factors are necessary. Firstly, it is necessary to have enough resources, which must be invested to create advantageous value chain based on customer value. It is also necessary to be sure of the cost advantage of the value chain. Secondly, the consumption of resources must be reduced as much as possible to enable the smallest operating cost for the value chain and make sure of the cost advantage based on maximum business value or profit. It is a kind of cost control from the whole view of creation and supply of value. In practice, it is also a kind of cost control system based on the value chain. It includes enough control and necessary resource investment from the view of the value creation, and keeps consumption of resources to a reasonable level from the view of the value supply. The main object of the first factor is to construct the advantageous value chain from creating customer value; and the second factor is to strengthen the advantageous value chain from supplying or producing customer value. Therefore it is a new kind of idea to explore this cost control from the whole view of creation and supply of value. It is more profitable for businesses to gain sustainable competitive advantage.
文摘After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.
文摘In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.
文摘This paper proposes that organizational performance improvement could be achieved through improving the relationship between suppliers and customers. Accordingly, the paper proposes that performance could be improved by properly managing differences (gaps) that are usually found between customers' expectations and of suppliers perception with respect to services delivered. The paper also proposes that gaps in the relationship between customers and suppliers could be analyzed using mapping techniques. The paper points to the possibility of finding perception gaps and expectation gaps in the interrelated value attributes of goods and/or services; namely quality, cost, and time of delivery of goods or services to customers. In addition, the paper suggests that those gaps may impact on the performance from the perspectives of quality, cost, and speed of delivery of the service. It is envisaged that this research could assist management in controlling cost and avoid wastage and improve organizational performance.
文摘An integrated pest management model of Cost/Benefit analysis strategy was constructed for stem corn borer Sesamia cretica using complementary control measures of different resistant genotypes of corn with the chemical insecticide diazinon 60%. Based on Cost/Benefit analysis result, the resistant genotype (SAKHA 9433) provides maximum economic value of production at the model point where no spray of insecticide is applied. The applications of one or two sprays do not justify the use of chemical insecticide but rather result in economic loss since the reduction in borer damage value, due to diazinon use, is lower than the cost of control (spray). However, the applications of one spray for the moderate resistant genotype (IPA 2052) and two sprays for the sensitive genotype (CML 323) during corn growing season would be of value to cover the cost of control (spray) but do not achieve similar economic value of revenue comparing with the resistant genotype.
文摘In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.