Determining the optimal timing is the core of preventive maintenance. Highway agencies always face with the challenge of determining optimal timing for preventive maintenance, particularly in China where there are no ...Determining the optimal timing is the core of preventive maintenance. Highway agencies always face with the challenge of determining optimal timing for preventive maintenance, particularly in China where there are no condition indicators designed for determining adequate timing for applying preventive maintenance and little literature relating to the development of pavement performance. This work presented the indicators, including crack ratio (Rc), rutting depth (DR), international roughness index (IIR) and sideway force coefficient (CsF) to determine the adequate timing for preventive maintenance in China. The proper ranges of each indicator to apply to preventive maintenance were then recommended. They are 0.28%-1.4% for Rc, 10-15 mm for DR, 1.97-3.5 for lrR, 40--50 for CSF. Based on pavement condition survey data collected on the test roads in Hebei Province, China, on the application of slurry seal at different timings, the pavement performance was established and the adequate timings for applying slurry seal was studied. Based on benefit-cost analysis, it is suggested that the fourth year is the optimal timing for applying slurry seal based on the condition in China. A framework is established to determine the adequate timings of applying other preventive maintenance methods.展开更多
This paper will be on the real estate development enterprise cost analysis and cost forecast, decision-making, plan, control, analysis and feedback were described, as well as how to use value engineering to enterprise...This paper will be on the real estate development enterprise cost analysis and cost forecast, decision-making, plan, control, analysis and feedback were described, as well as how to use value engineering to enterprise value chain each link cost allocation, ut also to the enterprise strategy analysis and research, as well as cost management and strategic interaction analysis. Finally, it has a cost of real estate development enterprises case analysis and research. The author believes that the article will be on the real estate development enterprise management have some practical significance.展开更多
This paper presents a game-theoretic method to predict microgrid(MG) development tendency in China. As many distribution generators(DGs) are integrated in distribution systems, analysis of MG formation necessity is co...This paper presents a game-theoretic method to predict microgrid(MG) development tendency in China. As many distribution generators(DGs) are integrated in distribution systems, analysis of MG formation necessity is conducted from the aspect of DGs. In order to maximize the profit brought by DGs and to earn money from arbitrage, it may be necessary for customers to combine their DGs and loads and to construct an MG to obtain maximal control ability. A game model is built to emulate trading between MGs and the distribution system based on MG power control, in which both trading profit and outage cost are considered for each MG. Nash equilibrium(NE) is calculated, and sensitivities of NE to some boundary conditions are studied. The results show that variable MG trading prices with appropriate net generation cost(i.e., DG generation cost minus government subsidy price) may encourage the growth of MGs. Government subsidies, generation costs, and trading prices may also affect DG use, and therefore they may impact customer motivation to build MGs.展开更多
基金Project(IRT1050) supported by Program for Changjiang Scholars and Innovative Research Team in University, ChinaProject (2009318000027) supported by Ministry of Transport of ChinaProject(CHD2011TD002) supported by the Special Fund for Basic Scientific Research of Central Colleges, Chang’an University, China
文摘Determining the optimal timing is the core of preventive maintenance. Highway agencies always face with the challenge of determining optimal timing for preventive maintenance, particularly in China where there are no condition indicators designed for determining adequate timing for applying preventive maintenance and little literature relating to the development of pavement performance. This work presented the indicators, including crack ratio (Rc), rutting depth (DR), international roughness index (IIR) and sideway force coefficient (CsF) to determine the adequate timing for preventive maintenance in China. The proper ranges of each indicator to apply to preventive maintenance were then recommended. They are 0.28%-1.4% for Rc, 10-15 mm for DR, 1.97-3.5 for lrR, 40--50 for CSF. Based on pavement condition survey data collected on the test roads in Hebei Province, China, on the application of slurry seal at different timings, the pavement performance was established and the adequate timings for applying slurry seal was studied. Based on benefit-cost analysis, it is suggested that the fourth year is the optimal timing for applying slurry seal based on the condition in China. A framework is established to determine the adequate timings of applying other preventive maintenance methods.
文摘This paper will be on the real estate development enterprise cost analysis and cost forecast, decision-making, plan, control, analysis and feedback were described, as well as how to use value engineering to enterprise value chain each link cost allocation, ut also to the enterprise strategy analysis and research, as well as cost management and strategic interaction analysis. Finally, it has a cost of real estate development enterprises case analysis and research. The author believes that the article will be on the real estate development enterprise management have some practical significance.
基金supported by the National Natural Science Foundation of China(Grant No.51321005)the National Hi-Tech Research and Development Program of China("863"Project)(Grant No.2012AA050217)
文摘This paper presents a game-theoretic method to predict microgrid(MG) development tendency in China. As many distribution generators(DGs) are integrated in distribution systems, analysis of MG formation necessity is conducted from the aspect of DGs. In order to maximize the profit brought by DGs and to earn money from arbitrage, it may be necessary for customers to combine their DGs and loads and to construct an MG to obtain maximal control ability. A game model is built to emulate trading between MGs and the distribution system based on MG power control, in which both trading profit and outage cost are considered for each MG. Nash equilibrium(NE) is calculated, and sensitivities of NE to some boundary conditions are studied. The results show that variable MG trading prices with appropriate net generation cost(i.e., DG generation cost minus government subsidy price) may encourage the growth of MGs. Government subsidies, generation costs, and trading prices may also affect DG use, and therefore they may impact customer motivation to build MGs.