As a vital infrastructure initiative with significant impacts on national development and public welfare,water conservancy projects play an essential role in advancing agricultural development and mitigating losses ca...As a vital infrastructure initiative with significant impacts on national development and public welfare,water conservancy projects play an essential role in advancing agricultural development and mitigating losses caused by flooding.However,these projects often require substantial investments and extended construction periods,leading to the inevitable emergence of various financial risks during implementation.This paper aims to explore the current challenges in financial risk management of the S water conservancy project,offering practical management strategies and solutions to address these financial difficulties.Through a detailed assessment and analysis of the S water conservancy project,the study seeks to provide valuable references and insights for similar projects to better manage financial risks,ensuring their smooth progression and successful completion.The proposed control measures are designed not only to effectively mitigate the financial risks specific to the S water conservancy project but also to offer actionable lessons for other similar projects.By promoting and applying these measures,the overall financial management capabilities of the industry can be enhanced,providing robust support for the sustainable development of water conservancy projects.展开更多
In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi...In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.展开更多
The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis...The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis, and expert consultation. This evaluation index system can be divided into six first-level indices: the degree to which facilities are intact and functionality standards are reached, the status of operation and management funds, the rationality and degree of advancement of the management team structure, the adaptability and rationality of the water conservancy project management system, the degree of automatization and informationization of the management techniques, and the conduciveness of the exterior environment. The weights for evaluation indices were obtained through the analytic hierarchy process method with consideration of the difference between public welfare and profit-oriented water conservancy projects. This study provides a scientific method for evaluating the positive operation of water conservancy projects.展开更多
The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological ...The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.展开更多
Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through th...Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through the use of literature review,case analysis and statistical analysis and other methods,with agricultural water conservancy projects as the research object,and comparing activity-based costing with the traditional model of cost accounting,the writer carries out the corresponding value chain analysis,and comes to the following conclusion: the statistical calculation and analysis of the entire construction process based on activity-based costing can accurately and effectively control the costs of water conservancy projects. Through the use of activity-based costing,the cost data of agricultural water conservancy projects is more detailed and accurate,and cost management personnel can also find non-value-added activities,optimize the enterprise's value chain and achieve cost control objectives through the analysis of the activity chain and value chain of agricultural water conservancy projects.展开更多
China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role...China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role in water conservancy projects offarmland. Therefore, full attention should be paid toriver management of farmland. This thesis analyzes itand proposes countermeasures for governance.展开更多
The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of ...The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of water conservancy projects.This article studies the causes of water infiltration in water conservancy projects and introduces related antiseepage technologies,hoping to be a reference for the implementation of anti-seepage projects.Through research,it is found that the factors that cause water infiltration in water conservancy projects include water conservancy project structural changes,environmental factors and construction factors.Relevant personnel can use concrete anti-seepage wall construction technology and high-pressure jet grouting technology to do the relevant anti-seepage work of water conservancy projects.展开更多
In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy e...In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.展开更多
文摘As a vital infrastructure initiative with significant impacts on national development and public welfare,water conservancy projects play an essential role in advancing agricultural development and mitigating losses caused by flooding.However,these projects often require substantial investments and extended construction periods,leading to the inevitable emergence of various financial risks during implementation.This paper aims to explore the current challenges in financial risk management of the S water conservancy project,offering practical management strategies and solutions to address these financial difficulties.Through a detailed assessment and analysis of the S water conservancy project,the study seeks to provide valuable references and insights for similar projects to better manage financial risks,ensuring their smooth progression and successful completion.The proposed control measures are designed not only to effectively mitigate the financial risks specific to the S water conservancy project but also to offer actionable lessons for other similar projects.By promoting and applying these measures,the overall financial management capabilities of the industry can be enhanced,providing robust support for the sustainable development of water conservancy projects.
基金supported by the Water Conservancy Science and Technology Project of Jiangsu Province(Grant No.2012041)the Jiangsu Province Ordinary University Graduate Student Research Innovation Project(Grant No.CXZZ13_0256)
文摘In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.
文摘The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis, and expert consultation. This evaluation index system can be divided into six first-level indices: the degree to which facilities are intact and functionality standards are reached, the status of operation and management funds, the rationality and degree of advancement of the management team structure, the adaptability and rationality of the water conservancy project management system, the degree of automatization and informationization of the management techniques, and the conduciveness of the exterior environment. The weights for evaluation indices were obtained through the analytic hierarchy process method with consideration of the difference between public welfare and profit-oriented water conservancy projects. This study provides a scientific method for evaluating the positive operation of water conservancy projects.
基金supported by the Fundamental Research Funds for the Central Universities(Grant No.2013B102008)the Open Fund of the Yellow River Committee(Grant No.2011535012)
文摘The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.
文摘Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through the use of literature review,case analysis and statistical analysis and other methods,with agricultural water conservancy projects as the research object,and comparing activity-based costing with the traditional model of cost accounting,the writer carries out the corresponding value chain analysis,and comes to the following conclusion: the statistical calculation and analysis of the entire construction process based on activity-based costing can accurately and effectively control the costs of water conservancy projects. Through the use of activity-based costing,the cost data of agricultural water conservancy projects is more detailed and accurate,and cost management personnel can also find non-value-added activities,optimize the enterprise's value chain and achieve cost control objectives through the analysis of the activity chain and value chain of agricultural water conservancy projects.
文摘China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role in water conservancy projects offarmland. Therefore, full attention should be paid toriver management of farmland. This thesis analyzes itand proposes countermeasures for governance.
文摘The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of water conservancy projects.This article studies the causes of water infiltration in water conservancy projects and introduces related antiseepage technologies,hoping to be a reference for the implementation of anti-seepage projects.Through research,it is found that the factors that cause water infiltration in water conservancy projects include water conservancy project structural changes,environmental factors and construction factors.Relevant personnel can use concrete anti-seepage wall construction technology and high-pressure jet grouting technology to do the relevant anti-seepage work of water conservancy projects.
文摘In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.