期刊文献+
共找到3,288篇文章
< 1 2 165 >
每页显示 20 50 100
Understanding Complexity at the Pre-Construction Stage of Project Planning for Construction Projects
1
作者 Mehran Barani Shikhrobat Roger Flanagan Shabnam Kabiri 《American Journal of Operations Research》 2025年第1期1-27,共27页
The construction projects’ dynamic and interconnected nature requires a comprehensive understanding of complexity during pre-construction. Traditional tools such as Gantt charts, CPM, and PERT often overlook uncertai... The construction projects’ dynamic and interconnected nature requires a comprehensive understanding of complexity during pre-construction. Traditional tools such as Gantt charts, CPM, and PERT often overlook uncertainties. This study identifies 20 complexity factors through expert interviews and literature, categorising them into six groups. The Analytical Hierarchy Process evaluated the significance of different factors, establishing their corresponding weights to enhance adaptive project scheduling. A system dynamics (SD) model is developed and tested to evaluate the dynamic behaviour of identified complexity factors. The model simulates the impact of complexity on total project duration (TPD), revealing significant deviations from initial deterministic estimates. Data collection and analysis for reliability tests, including normality and Cronbach alpha, to validate the model’s components and expert feedback. Sensitivity analysis confirmed a positive relationship between complexity and project duration, with higher complexity levels resulting in increased TPD. This relationship highlights the inadequacy of static planning approaches and underscores the importance of addressing complexity dynamically. The study provides a framework for enhancing planning systems through system dynamics and recommends expanding the model to ensure broader applicability in diverse construction projects. 展开更多
关键词 project planning project Complexity Measurement Uncertainty Management project Risk Management Strategic project Scheduling
在线阅读 下载PDF
Project Planning and Scheduling in the Face of the Fourth Industrial Revolution(4IR)
2
作者 Masithembe Kafile 《Journal of Business Administration Research》 2021年第3期51-61,共11页
This paper addresses the integrated processes of planning and scheduling of projects using technologies advanced tools as means for managing change in the era of the 4IR.The paper explores the traditional project mana... This paper addresses the integrated processes of planning and scheduling of projects using technologies advanced tools as means for managing change in the era of the 4IR.The paper explores the traditional project management planning and scheduling tools in conjunction with what technology has to offer,to bridge the gap between the traditional project management planning and scheduling tools and what the modern-day business market demands.An analysis of literature covering a wide range of theoretic and empirical studies was performed.The theories underlying various planning and scheduling methods were analysed in relation to the design of projects.A descriptive quantitative secondary data was used as a tool to assess the impact of technology on project planning for scheduling.The analysis of the study’s data was conducted using the principles of cross-tabulation.Inferences were drawn on the significant impact of the use of advanced technological tools on project planning for scheduling in current business time.Organisations can make use of the findings of this study to correctly apply the available advanced technological tools for more efficient schedule management planning to enhance the successful delivery of their projects.Further,this research can be used to provide learning opportunities for new and inexperienced planners and schedulers,and as a basis for further research in this field of knowledge. 展开更多
关键词 project planning Schedule management project management Advanced project management tools Fourth industrial revolution(4IR)
在线阅读 下载PDF
Scenario-based modeling and solving research on robust weapon project planning problems 被引量:4
3
作者 XIA Boyuan ZHAO Qingsong +2 位作者 YANG Kewei DOU Yajie YANG Zhiwei 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2019年第1期85-99,共15页
Weapon project planning(WPP) plays a critical role in the process of national defense development and establishment of the future national defense force. WPP faces the backgrounds of various uncertainties, intense int... Weapon project planning(WPP) plays a critical role in the process of national defense development and establishment of the future national defense force. WPP faces the backgrounds of various uncertainties, intense inter-influence of weapon systems and involves modelling, assessment, and optimization procedures.The contents of this paper are mainly divided into three parts: first,the WPP processes are analyzed, and related elements are formulated to transform the qualitative problem to mathematics form;second, the value evaluation model of WPP solutions is proposed based on two criteria of total capability gap and total capability dispersion; third, two robustness optimization models are constructed based on the absolute robustness criterion and the robustness deviation criterion to support the robustness optimization process under multi-scenario. Finally, a case is studied to examine the feasibility and effectiveness of the proposed models and approaches. 展开更多
关键词 WEAPON project planning (WPP) uncertainty ROBUSTNESS MULTI-STAGE scenario.
在线阅读 下载PDF
Stakeholder Participation in Project Planning: Prerequisite to Effective Completion of Urban Road Transport Infrastructure Projects in Kenya 被引量:1
4
作者 Johnson Matu Dorothy Kyalo +1 位作者 J. Mbugua Angeline Mulwa 《Journal of Building Construction and Planning Research》 2020年第1期73-91,共19页
Stakeholder involvement in the project planning process should include a variety of actors with different roles and responsibilities at the planning phase of the project life cycle. Failure to adequately plan greatly ... Stakeholder involvement in the project planning process should include a variety of actors with different roles and responsibilities at the planning phase of the project life cycle. Failure to adequately plan greatly reduces the project’s chances of successfully accomplishing its goals. The objective of this study was to determine the influence of stakeholder participation in project planning on the completion of urban road transport-infrastructure projects in Kenya. Pragmatic research paradigm was utilized for this study to facilitate mixed research methods. The study adopted descriptive survey and correlational research design. The target population was 1593. A sample size of 309 respondents was drawn utilizing purposive and simple random sampling procedures. A five point Likert type scale questionnaire was used to collect quantitative data while interview guides were used to collect qualitative data. The study found that stakeholder participation in project planning had a positive and significant influence on the completion of urban road transport infrastructure projects in Kenya (r = 0.838, R2 = 0.703, F (4, 209) = 123.43, p 2 = 0.703 indicating that stakeholder participation in project planning explains 70.3% of the variations in the completion of urban road transport infrastructure projects in Kenya. The study concluded that stakeholder participation in project planning significantly influences completion of urban road transport-infrastructure projects in Kenya. The study recommends the need to increase training and awareness on participation in project planning. The study also recommends the need to develop a guiding policy document detailing the importance of stakeholder participation in road construction life cycle in order to curb any future misgivings in implementation of these important socio-economic projects. 展开更多
关键词 STAKEHOLDER Participation project planNING BUDGETING Scope planNING Resource planNING
在线阅读 下载PDF
Practical Application of Participatory Approach in Land Conversion Project Planning: A Case in Quxian County, Sichuan Province
5
作者 LI Weichang DENG HuafengResearch Institute of Forestry Policy and Information. Chinese Academy of Forestry. Beijing 100091. China eiiine Forestrv Universuty. Beiiine 100081. China 《Chinese Forestry Science and Technology》 2003年第4期50-57,共8页
Application of participatory approaches in governmental forestry projects is a bran-new forestry design method. The purpose is to plan the utilization of land correctly, and to determine planting sites, planting speci... Application of participatory approaches in governmental forestry projects is a bran-new forestry design method. The purpose is to plan the utilization of land correctly, and to determine planting sites, planting species, participating households and management models, based on the projects' requirements and the farmers' demands. Participatory approaches are now practiced in some of the counties in Land Conversion Project. The paper presents the significance and necessity of practicing community mechanis... 展开更多
关键词 participatory approaches Land Conversion project planning
原文传递
Information on Power Projects Planned in China
6
《Electricity》 2009年第3期53-54,共2页
关键词 project 2010 III HEAT Information on Power projects planned in China
在线阅读 下载PDF
Information on Power Projects Planned in China
7
《Electricity》 2009年第4期52-54,共3页
关键词 2010 HEAT project Information on Power projects planned in China
在线阅读 下载PDF
Information on Power Projects Planned in China
8
《Electricity》 2009年第1期52-54,共3页
关键词 project 2010 Information on Power projects planned in China
在线阅读 下载PDF
Information on Power Projects Planned in China
9
《Electricity》 2010年第1期51-53,共3页
关键词 2010 project Information on Power projects planned in China
在线阅读 下载PDF
PLANNING OF HSE MANAGEMENT OF GEN- ERAL CONTRACT PROJECTS [- 1 ]
10
作者 SunChenglong 《石油化工安全环保技术》 CAS 2012年第6期I0001-I0004,共4页
关键词 摘要 编辑部 编辑工作 读者
在线阅读 下载PDF
Seven Projects Planned for Huabei Oilfield
11
《China Oil & Gas》 CAS 1997年第2期127-127,共1页
关键词 Seven projects planned for Huabei Oilfield
在线阅读 下载PDF
Three Gorges Dam project in great progress as planned
12
《Electricity》 1996年第3期26-26,共1页
It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporatio... It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporation has reported that contractors and other staff are working hard to ensure that the flood season does not slow the dam project. The company recently detailed the mammoth tasks that have taken place so 展开更多
关键词 Three Gorges Dam project in great progress as planned
在线阅读 下载PDF
SHAANXI'S KEY PROJECTS FOR FIXED ASSETS INVESTMENT DURING THE NINTH FIVE-YEAR PLAN
13
《China's Foreign Trade》 1996年第9期24-24,共1页
During the Eighth Five-Year Planperiod, Shaanxi Province intensifiedthe restructuring of investment andmacro-control in fixed assets investment byimplementing the policy of "limiting totalamount, readjusting stru... During the Eighth Five-Year Planperiod, Shaanxi Province intensifiedthe restructuring of investment andmacro-control in fixed assets investment byimplementing the policy of "limiting totalamount, readjusting structure, rectifying orderand improving efficiency". The wholeprovince realized RMB 110 billion in fixedassets investment, (including RMB 86.5 billionby state-owned units, RMB 14.23 billionthrough loans from the construction bank,making up 16.5 percent), RMB 67 billionmore than in the Seventh Five-Year Planperiod, with an annual increase of 26.5 percent.Thanks to the support, a group of medium-to-large and key projects have been put 展开更多
关键词 WILL SHAANXI’S KEY projectS FOR FIXED ASSETS INVESTMENT DURING THE NINTH FIVE-YEAR plan than
在线阅读 下载PDF
A Study of Flue Cas Desulfurization Plan for a Power Plant Project
14
《Electricity》 1997年第4期26-28,共3页
关键词 A Study of Flue Cas Desulfurization plan for a Power plant project
在线阅读 下载PDF
State Key Power Construction Projects in 1999 Issued from the State Development Planning Commission
15
《Electricity》 1999年第3期35-35,共1页
关键词 State Key Power Construction projects in 1999 Issued from the State Development planning Commission
在线阅读 下载PDF
Research on Top-layer Planning and Overall Design Project Decision of Weapon System Based on Analytic Hierarchy Process
16
作者 武瑞文 《Defence Technology(防务技术)》 SCIE EI CAS 2012年第4期248-256,共9页
Based on analytic hierarchy process(AHP) theory,a vital important problem for top-layer planning and overall design of modern self-propelled gun-howitzer system,namely overall project decision-making,was analyzed.A hi... Based on analytic hierarchy process(AHP) theory,a vital important problem for top-layer planning and overall design of modern self-propelled gun-howitzer system,namely overall project decision-making,was analyzed.A hierarchy model was built to solve the complex and uncertain problem,and a decision-making index system was established.Then,the weights in all layers of the model were determined by simulating experts.Finally,according to the calculated results of the elements in each layer,the weights of the alternatives to the overall goal were calculated to conduct the hierarchy total decision.A decision example shows that the overall project of a self-propelled gun-howitzer A is much better than that of another self-propelled gun-howitzer B,digitalized in comprehensive efficiency,operability,system accuracy and economy,but inferior to it in the information capability,and there exists relatively larger gap between them in the information sharing index. 展开更多
关键词 军事技术 军事系统工程学 数学 物理
在线阅读 下载PDF
Analysis on decision-making model of plan evaluation based on grey relation projection and combination weight algorithm 被引量:10
17
作者 ZHANG Zhicai CHEN Li 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2018年第4期789-796,共8页
In military service joint operations, when there are more operational forces, more multifarious materials are consumed, the support is more complex and fuzzy, the deployment of personnel is more rapid, and the support... In military service joint operations, when there are more operational forces, more multifarious materials are consumed, the support is more complex and fuzzy, the deployment of personnel is more rapid, and the support provided by wartime military material support powers can be more effective. When the principles,requirements, influencing factors and goals of military material support forces are deployed in wartime, an evaluation indicator system is established. Thus, a new combined empowerment method based on an analytic hierarchy process(AHP) is developed to calculate the subjective weights, and the rough entropy method is used to calculate the objective weights. Combination weights can be obtained by calculating the weight preference coefficient error, which is determined by combining the cooperative game method and the minimum deviation into objectives. This approach can determine the grey relation projection coefficient and synthesize the measure scheme superiority to finally optimize the deployment plan using the grey relation projection decision-making method. The results show that the method is feasible and effective;it can provide a more scientific and practical decision-making basis for the military material support power deployment in wartime. 展开更多
关键词 method for grey relation projection decision-making military supply power in war deployment plan optimization ana-lytic hierarchy process (AHP) rough entropy method
在线阅读 下载PDF
老旧小区自主更新的权利构建与规划机制探究 被引量:1
18
作者 邵永威 戚冬瑾 《城市规划》 北大核心 2025年第1期59-68,共10页
政府可持续投入老旧小区改造资金有限,居民对自主更新呼声渐长。当前城市更新制度对自主更新定位模糊,已成为制约更新项目推进的重要因素。基于国内案例研究发现,主体权责不清是当前自主更新的困境之一,其本质是对更新改造权利界定不足... 政府可持续投入老旧小区改造资金有限,居民对自主更新呼声渐长。当前城市更新制度对自主更新定位模糊,已成为制约更新项目推进的重要因素。基于国内案例研究发现,主体权责不清是当前自主更新的困境之一,其本质是对更新改造权利界定不足引起的。探讨建设开发权和规划编制权的内涵、赋权对象、具体形态和效力,参照英国和日本居民自主更新的制度经验,提出通过法律或政策明确自主更新权利主体和组织实施主体的相关权益;规划制度上明晰各类更新改造规划(计划)与法定规划和规划许可的关系;建议政府针对不同类型老旧小区因地施策,激励社会资本投入,调动居民和社会资本的参与积极性。 展开更多
关键词 老旧小区改造 自主更新 开发权 邻里规划 市街地再开发事业
在线阅读 下载PDF
基于总-详分层管控的建设项目用地合规性审查机制研究
19
作者 邓木林 朱江 +2 位作者 欧阳效福 周艺霖 夏剑琴 《西部人居环境学刊》 北大核心 2025年第1期188-194,共7页
国土空间用途管制是国土空间规划实施的关键环节和国土空间开发与保护的核心制度。建设项目用地合规性审查是国土空间用途管制制度改革的重要内容。过去由于城乡规划和土地利用规划的管控对象和机制不同,造成建设项目在规划审批上存在... 国土空间用途管制是国土空间规划实施的关键环节和国土空间开发与保护的核心制度。建设项目用地合规性审查是国土空间用途管制制度改革的重要内容。过去由于城乡规划和土地利用规划的管控对象和机制不同,造成建设项目在规划审批上存在较多不协调,带来建设项目难以落地的问题。随着国土空间规划体系建立和实施,在“多规合一”和全域全要素管控要求下,如何建立统一的建设项目用地合规性审查机制是各级自然资源管理部门关注的重点问题。本研究在梳理过去城乡规划和土地利用规划管控机制特点的基础上,对新时期国土空间体系下建设项目用地合规性审查机制进行了探索,提出基于总—详分层,城镇开发边界内外差异化的项目用地管控思路,并建议按技术修正、一般调整和重大调整等情形分类确定项目用地规划调整方式,为我国国土空间用途管制制度完善提供思路建议。 展开更多
关键词 国土空间用途管制 国土空间规划 总—详分层管控 建设项目 审查机制
在线阅读 下载PDF
上一页 1 2 165 下一页 到第
使用帮助 返回顶部