利用超高性能混凝土(ultra high performance concrete, UHPC)材料特性,提出一种针对预制拼装桥墩的重力灌浆构造,即采用UHPC灌浆并依靠立柱自身重力完成拼接的插槽式连接构造。为研究该形式桥墩的抗震性能,设计完成了三个桥墩的拟静力...利用超高性能混凝土(ultra high performance concrete, UHPC)材料特性,提出一种针对预制拼装桥墩的重力灌浆构造,即采用UHPC灌浆并依靠立柱自身重力完成拼接的插槽式连接构造。为研究该形式桥墩的抗震性能,设计完成了三个桥墩的拟静力试验,分别为整体现浇墩Z1、新型插槽式连接墩P1及现有“I型”连接墩P2,并采用OpenSees有限元软件做模拟分析,与试验结果对比分析。结果表明:三个桥墩的破坏形式一致,均为弯曲破坏;Z1墩与P1墩滞回曲线呈梭形,滞回环较为饱满,且相同位移加载循环下的滞回路径较为吻合,P2墩接口处钢筋与混凝土间黏结滑移影响较大,导致滞回环面积减小,桥墩整体滞回耗能能力降低;P1墩的耗能能力较Z1墩和P2墩分别提升7.0%、10.7%,呈现峰值荷载小、失效速率慢、极限位移大、滞回耗能多的骨架趋势。试验结果与有限元模拟结果较为吻合,抗震性能参数差幅在10.0%以内,新型插槽式连接墩可应用于实际工程。展开更多
Mining blasts may be defined as the use of explosive charges in a controlled manner by following a tightly controlled timing sequence according to an assigned firing order. Changes of timing between charges may result...Mining blasts may be defined as the use of explosive charges in a controlled manner by following a tightly controlled timing sequence according to an assigned firing order. Changes of timing between charges may result in an altered firing order and failure of the blasting sequence, which can cause high vibration levels, poor fragmentation, and/or an undesirable rock mass movement direction. Despite the importance of timing in determining mine blast results, there exists a lack of methodologies or tools with which to assess performance of a complete blast based on delay type and timing sequence. This document applies reliability engineering principles to evaluate the performance of a mine blast. The analyses are based on test results of the accuracy and precision of electronic and pyrotechnic detonators for typical firing times used in a surface coal mine, but may be applied to a variety of mines and timing scenarios.展开更多
文摘利用超高性能混凝土(ultra high performance concrete, UHPC)材料特性,提出一种针对预制拼装桥墩的重力灌浆构造,即采用UHPC灌浆并依靠立柱自身重力完成拼接的插槽式连接构造。为研究该形式桥墩的抗震性能,设计完成了三个桥墩的拟静力试验,分别为整体现浇墩Z1、新型插槽式连接墩P1及现有“I型”连接墩P2,并采用OpenSees有限元软件做模拟分析,与试验结果对比分析。结果表明:三个桥墩的破坏形式一致,均为弯曲破坏;Z1墩与P1墩滞回曲线呈梭形,滞回环较为饱满,且相同位移加载循环下的滞回路径较为吻合,P2墩接口处钢筋与混凝土间黏结滑移影响较大,导致滞回环面积减小,桥墩整体滞回耗能能力降低;P1墩的耗能能力较Z1墩和P2墩分别提升7.0%、10.7%,呈现峰值荷载小、失效速率慢、极限位移大、滞回耗能多的骨架趋势。试验结果与有限元模拟结果较为吻合,抗震性能参数差幅在10.0%以内,新型插槽式连接墩可应用于实际工程。
文摘Mining blasts may be defined as the use of explosive charges in a controlled manner by following a tightly controlled timing sequence according to an assigned firing order. Changes of timing between charges may result in an altered firing order and failure of the blasting sequence, which can cause high vibration levels, poor fragmentation, and/or an undesirable rock mass movement direction. Despite the importance of timing in determining mine blast results, there exists a lack of methodologies or tools with which to assess performance of a complete blast based on delay type and timing sequence. This document applies reliability engineering principles to evaluate the performance of a mine blast. The analyses are based on test results of the accuracy and precision of electronic and pyrotechnic detonators for typical firing times used in a surface coal mine, but may be applied to a variety of mines and timing scenarios.