In-house part supply affects the efficiency of mixed-model assembly lines considerably. Hence, we propose a reliable Just-In-Time part supply strategy with the use of decentralized supermarkets. For a given production...In-house part supply affects the efficiency of mixed-model assembly lines considerably. Hence, we propose a reliable Just-In-Time part supply strategy with the use of decentralized supermarkets. For a given production sequence and line layout, the proposed strategy schedules tow train routing and delivery problems jointly to minimize the number of employed town trains and the traveling time, while ensuring that stations never run out of parts. To solve this problem, a mathematical formulation is proposed for each sub-problem aiming at minimizing supply cost. Then, a dynamic programming algorithm for routing and a greedy algorithm for delivery are developed, both of which are of polynomial runtime. Finally, a computational study is implemented to validate the effectiveness of the strategy, and to investigate the effects of the delivery capacity of tow trains and storage capacity of stations on supply cost.展开更多
This study introduces a real-time controller design method under the effects of network time delay and external disturbance. The study first introduces the digital, virtual, intelligent trend of airplane assembly and ...This study introduces a real-time controller design method under the effects of network time delay and external disturbance. The study first introduces the digital, virtual, intelligent trend of airplane assembly and reveals the status and problems of digital airplane assembly studies. The Cyber-Physical System (CPS) structure is then proposed for digital airplane assembly, and the real-time control issues are discussed. Then, the question of real- time control undertaken by a parallel robot is simplified to a control question with bounded time delay and complex interference, and a mathematical description is presented. Next, a robust Hoo controller with a disturbance degree of decay 7 is designed according to the mathematical description. Finally, a simulation is conducted. All of the experiment results show the feasibility of the above proposed methods.展开更多
Motion planning issues encountered in assembling airplanes by employing the 6PURU parallel mechanism are analyzed in this paper. A sine curve of the change rate of acceleration, which is called as jerk in the followin...Motion planning issues encountered in assembling airplanes by employing the 6PURU parallel mechanism are analyzed in this paper. A sine curve of the change rate of acceleration, which is called as jerk in the following text, is proposed for uniaxial flexible acceleration and deceleration planning based on the optimal time and velocity and acceleration constraints. Compared with other curves, the proposed curve can realize a continuous n-order derivative and the smooth change of the speed and acceleration. The method is computational^y simple and suitable for programming. In addition, a multiaxial coordinated movement scheme is proposed. The motion trajectory is no longer simply split into many single-direction trajectories nor are all single-direction planning trajectories combined directly. The multiaxial coordinated movement scheme aims to achieve synergic movement in multiple directions to ensure smoothness of the movement in the event of a kinematic error when maintaining a stable value. If the movement fails to achieve this goal, driving force mutations will deteriorate the effect of synergic movement. A physical model of the parallel mechanism is developed in simMechanics, and a holistic system model is completed in SIMULINK. The feasibility of the new planning algorithm is simulated and tested, and then, the multiaxial synergic movement planning method is proposed and verified.展开更多
This paper introduces a CPS application for intelligent aeroplane assembly.At first,the CPS structure is presented,which acquires the characteristics of general CPS and enables“simulation-based planning and control”...This paper introduces a CPS application for intelligent aeroplane assembly.At first,the CPS structure is presented,which acquires the characteristics of general CPS and enables“simulation-based planning and control”to achieve high level intelligent assembly.Then the paper puts forward data fusion estimation algorithm under synchronous and asynchronous sampling,respectively.The experiment shows that global optimal distributed fusion estimation under synchronized sampling proves to be closer to the actual value compared with ordinary weighted estimation,and multi-scale distributed fusion estimation algorithm of wavelet under asynchronous sampling does not need time registration,it can also directly link to data,and the error is smaller.This paper presents hybrid control strategy under the circumstance of joint action of the inner and outer loop to address the problems caused by the less controllable feature of the parallel mechanism when undertaking online process simulation and control.A robust adaptive sliding mode controller is designed based on disturbance observer to restrain inner interference and maintain robustness.At the same time,an outer collaborative trajectory planning is also designed.All the experiment results show the feasibility of above proposed methods.展开更多
Material handling has become one of the major challenges in modern production management.Consequently,this paper intends to investigate the part delivery of mixedmodel assembly lines with decentralized supermarkets an...Material handling has become one of the major challenges in modern production management.Consequently,this paper intends to investigate the part delivery of mixedmodel assembly lines with decentralized supermarkets and tow trains.Besides,uncertain exception disturbances,including tow train failures and adjustments of the production sequence,are also considered.To solve this problem,a heuristic-based dynamic delivery strategy is proposed,which dynamically schedules the route,departure time,quantities and types of loaded parts for each tour.To evaluate the performance of this strategy,it is used to solve an instance in comparison with the periodic delivery strategy,experimental results are reported and their performances are compared under different metrics.Moreover,a multi-scenario analysis is employed to determinate the long-term decisions,including the number of tow trains and the route layout.Finally,the critical storage is suggested to be set for each station to avoid part starvation resulting from disturbances,and its effect on the delivery performance is investigated.展开更多
基金supported in part by the National Key Technology Research and Development Program(No.2012BAF15G01)
文摘In-house part supply affects the efficiency of mixed-model assembly lines considerably. Hence, we propose a reliable Just-In-Time part supply strategy with the use of decentralized supermarkets. For a given production sequence and line layout, the proposed strategy schedules tow train routing and delivery problems jointly to minimize the number of employed town trains and the traveling time, while ensuring that stations never run out of parts. To solve this problem, a mathematical formulation is proposed for each sub-problem aiming at minimizing supply cost. Then, a dynamic programming algorithm for routing and a greedy algorithm for delivery are developed, both of which are of polynomial runtime. Finally, a computational study is implemented to validate the effectiveness of the strategy, and to investigate the effects of the delivery capacity of tow trains and storage capacity of stations on supply cost.
基金supported by the National Key Technology Research and Development Program of China (No. 2012BAF14G00)
文摘This study introduces a real-time controller design method under the effects of network time delay and external disturbance. The study first introduces the digital, virtual, intelligent trend of airplane assembly and reveals the status and problems of digital airplane assembly studies. The Cyber-Physical System (CPS) structure is then proposed for digital airplane assembly, and the real-time control issues are discussed. Then, the question of real- time control undertaken by a parallel robot is simplified to a control question with bounded time delay and complex interference, and a mathematical description is presented. Next, a robust Hoo controller with a disturbance degree of decay 7 is designed according to the mathematical description. Finally, a simulation is conducted. All of the experiment results show the feasibility of the above proposed methods.
基金supported by the National Science and Technology Supporting Plan of China (No. 2012BAF14G00)
文摘Motion planning issues encountered in assembling airplanes by employing the 6PURU parallel mechanism are analyzed in this paper. A sine curve of the change rate of acceleration, which is called as jerk in the following text, is proposed for uniaxial flexible acceleration and deceleration planning based on the optimal time and velocity and acceleration constraints. Compared with other curves, the proposed curve can realize a continuous n-order derivative and the smooth change of the speed and acceleration. The method is computational^y simple and suitable for programming. In addition, a multiaxial coordinated movement scheme is proposed. The motion trajectory is no longer simply split into many single-direction trajectories nor are all single-direction planning trajectories combined directly. The multiaxial coordinated movement scheme aims to achieve synergic movement in multiple directions to ensure smoothness of the movement in the event of a kinematic error when maintaining a stable value. If the movement fails to achieve this goal, driving force mutations will deteriorate the effect of synergic movement. A physical model of the parallel mechanism is developed in simMechanics, and a holistic system model is completed in SIMULINK. The feasibility of the new planning algorithm is simulated and tested, and then, the multiaxial synergic movement planning method is proposed and verified.
基金The work was supported by the project:2013BAF02B00.
文摘This paper introduces a CPS application for intelligent aeroplane assembly.At first,the CPS structure is presented,which acquires the characteristics of general CPS and enables“simulation-based planning and control”to achieve high level intelligent assembly.Then the paper puts forward data fusion estimation algorithm under synchronous and asynchronous sampling,respectively.The experiment shows that global optimal distributed fusion estimation under synchronized sampling proves to be closer to the actual value compared with ordinary weighted estimation,and multi-scale distributed fusion estimation algorithm of wavelet under asynchronous sampling does not need time registration,it can also directly link to data,and the error is smaller.This paper presents hybrid control strategy under the circumstance of joint action of the inner and outer loop to address the problems caused by the less controllable feature of the parallel mechanism when undertaking online process simulation and control.A robust adaptive sliding mode controller is designed based on disturbance observer to restrain inner interference and maintain robustness.At the same time,an outer collaborative trajectory planning is also designed.All the experiment results show the feasibility of above proposed methods.
基金supported in part by National Science and Technology Support Program Under Grant 2012BAF15G01.
文摘Material handling has become one of the major challenges in modern production management.Consequently,this paper intends to investigate the part delivery of mixedmodel assembly lines with decentralized supermarkets and tow trains.Besides,uncertain exception disturbances,including tow train failures and adjustments of the production sequence,are also considered.To solve this problem,a heuristic-based dynamic delivery strategy is proposed,which dynamically schedules the route,departure time,quantities and types of loaded parts for each tour.To evaluate the performance of this strategy,it is used to solve an instance in comparison with the periodic delivery strategy,experimental results are reported and their performances are compared under different metrics.Moreover,a multi-scenario analysis is employed to determinate the long-term decisions,including the number of tow trains and the route layout.Finally,the critical storage is suggested to be set for each station to avoid part starvation resulting from disturbances,and its effect on the delivery performance is investigated.