Real-Time Spreading Thickness Monitoring of High-core Rockfill Dam Based on K-nearest Neighbor Algorithm 被引量:4
1
作者 denghua zhong Rongxiang Du +2 位作者 Bo Cui Binping Wu Tao Guan 《Transactions of Tianjin University》 EI CAS 2018年第3期282-289,共8页
During the storehouse surface rolling construction of a core rockfilldam, the spreading thickness of dam face is an important factor that affects the construction quality of the dam storehouse' rolling surface and... During the storehouse surface rolling construction of a core rockfilldam, the spreading thickness of dam face is an important factor that affects the construction quality of the dam storehouse' rolling surface and the overallquality of the entire dam. Currently, the method used to monitor and controlspreading thickness during the dam construction process is artificialsampling check after spreading, which makes it difficult to monitor the entire dam storehouse surface. In this paper, we present an in-depth study based on real-time monitoring and controltheory of storehouse surface rolling construction and obtain the rolling compaction thickness by analyzing the construction track of the rolling machine. Comparatively, the traditionalmethod can only analyze the rolling thickness of the dam storehouse surface after it has been compacted and cannot determine the thickness of the dam storehouse surface in realtime. To solve these problems, our system monitors the construction progress of the leveling machine and employs a real-time spreading thickness monitoring modelbased on the K-nearest neighbor algorithm. Taking the LHK core rockfilldam in Southwest China as an example, we performed real-time monitoring for the spreading thickness and conducted real-time interactive queries regarding the spreading thickness. This approach provides a new method for controlling the spreading thickness of the core rockfilldam storehouse surface. 展开更多
关键词 Core rockfill dam Dam storehouse surface construction Spreading thickness K-nearest neighbor algorithm Real-time monitor
在线阅读 下载PDF
3-D Fracture Network Modelling in Hydropower Engineering Based on Optimal Monte Carlo Simulation 被引量:3
2
作者 Pan Yue denghua zhong +2 位作者 Fugen Yan Han Wu Yichi Zhang 《Transactions of Tianjin University》 EI CAS 2017年第4期351-359,共9页
Effectively and accurately modelling the spatial relation of fracture surfaces is crucial in the design and construction of large hydropower dams having a complex underlying geology. However, fracture surfaces are ran... Effectively and accurately modelling the spatial relation of fracture surfaces is crucial in the design and construction of large hydropower dams having a complex underlying geology. However, fracture surfaces are randomly formed and vary greatly with respect to their spatial distribution, which makes the construction of accurate 3-D models challenging. In this study, we use an optimal Monte Carlo simulation and dynamic conditioning to construct a fracture network model. We found the optimal Monte Carlo simulation to effectively reduce the error associated with the Monte Carlo method and use dynamic conditioning to ensure the consistency of the model with the actual distribution of fractures on the excavation faces and outcrops. We applied this novel approach to a hydropower station on the Jinshajiang River, China. The simulation results matched the real sampled values well, confirming that the model is capable of effectively and accurately simulating the spatial relations in a fracture network. © 2017, Tianjin University and Springer-Verlag Berlin Heidelberg. 展开更多
关键词 FRACTURE Hydroelectric power Hydroelectric power plants Intelligent systems Underground structures
在线阅读 下载PDF
Global Comprehensive Sensitivity Analysis of Arch Dam Construction Parameters Based on Orthogonal Experiment 被引量:1
3
作者 denghua zhong Zhiqiang Chu +3 位作者 Bingyu Ren Mengqi Zhao Tao Guan Wenshuai Song 《Transactions of Tianjin University》 EI CAS 2017年第5期427-433,共7页
The construction of arch dams exhibits high uncertainty. Sensitivity analysis of construction parameters is important for the design and optimization of dam construction duration. However, current research cannot full... The construction of arch dams exhibits high uncertainty. Sensitivity analysis of construction parameters is important for the design and optimization of dam construction duration. However, current research cannot fully consider the combined influences of multiple parameters on the total construction. To effectively analyze the duration of arch dam construction, this study proposes a global comprehensive sensitivity analysis method in view of the whole process of arch dam construction based on an orthogonal experiment. This method could comprehensively consider the influence of the construction parameters that may lead to the uncertainty of construction duration. In addition, this method is able to identify the key parameters that may have a significant effect on duration uncertainty and sums up the general rules of combined parameters’ interaction effect, which provides a scientific basis for reasonable optimization of the duration of dam construction. © 2017, Tianjin University and Springer-Verlag GmbH Germany. 展开更多
关键词 Arch dams ARCHES DAMS Uncertainty analysis
在线阅读 下载PDF
Real-Time Update of Sequence Placement Logic for High Arch Dams Based on Evidence Weight Discount 被引量:1
4
作者 Tao Guan denghua zhong Bingyu Ren 《Transactions of Tianjin University》 EI CAS 2017年第3期267-276,共10页
Sequence placement logic plays a significant role in construction simulation of high arch dams and directly affects the simulation process and results. To establish a sequence logic for dam block placement, the constr... Sequence placement logic plays a significant role in construction simulation of high arch dams and directly affects the simulation process and results. To establish a sequence logic for dam block placement, the construction scheme, real-time construction process, and random factors of the site all need to be considered in detail. There are few studies available currently that take all these factors into consideration. To address this problem, a real-time update of sequence placement logic for high arch dams based on evidence weight discount is proposed in this study. First, the subjective weight of the dam block sequence priority criteria is built using a consistent matrix method based on the construction scheme. Second, using evidence theory, dynamic objective weight of the priority criteria and basic probability assignment is built. Finally, using a weight self-adaptive adjustment method and comprehensive evidence discounting, the placing probabilities of different dam blocks are obtained. A case study indicates that this method can realize real-time update of sequence placement logic. © 2017, Tianjin University and Springer-Verlag Berlin Heidelberg. 展开更多
关键词 Arch dams ARCHES DAMS