摘要
以胶州湾湾口海底隧道青岛端接线工程2号斜井流沙段的施工为例,探讨了小断面隧道过流沙段工法的选择、施工注意事项等,以期为类似工程的施工提供借鉴。
Taking the construction of No.2 inclined shaft’s quicksand zone of the Qingdao End connection project of Jiaozhou Bay’s Mouth Channel Tunnel as an example, this paper probes into the selection of the method for the construction of the tunnel with small section passing quicksand zone and some matters needing attention in the construction for proving some references for the construction of similar engineering.
出处
《科技情报开发与经济》
2011年第30期215-217,共3页
Sci-Tech Information Development & Economy
关键词
小断面隧道
流沙段施工
施工方案
tunnel with small section
construction in quicksand zone
construction scheme